en
Installation instructions
46
29.4 Installation underneath a hob
If the appliance is installed under a hob, the following
minimum dimensions must be adhered to (including
substructure, if applicable).
The minimum worktop thickness a is based on the
required minimum clearance .
Hob type
a raised in mm
a flush in mm
b in mm
Induction hob
42
43
5
Full-surface induction hob
52
53
5
Gas hob
32
43
5
1
Electric hob
32
35
2
1
Observe different national installation instructions for the hob.
29.5 Installation in a tall unit
Observe the installation dimensions and the installation
instructions when installing in a tall unit.
¡
To ventilate the appliance, the intermediate floors
must have a ventilation cut-out.
¡
If the tall unit has another back panel in addition to
the element back panels, this must be removed.
¡
Only fit the appliance up to a height which allows
accessories to be easily removed.
29.6 Installing two appliances on top of
each other
Your appliance can also be installed above or below
another appliance. Observe the installation dimensions
and the installation instructions when installing appli-
ances on top of each other.
¡
To ventilate the appliances, the intermediate floor
must have a ventilation cut-out.
¡
To ensure sufficient ventilation of the two appli-
ances, there must be a ventilation opening of at
least 200 cm² in the base area. To do this, trim the
base panel or fit a ventilation grille.