Issue 03/01
2 Installation
MICROMASTER 411 & COMBIMASTER 411 Operating Instructions
6SE6400-5CA00-0BP0
21
2.1
Installation after a Period of Storage
Following a prolonged period of storage, you must reform the capacitors in the
inverter. The requirements are listed below.
100
50
75
0,5
1
[%]
2
4
6
8
Storage period less than 1 year:
Storage period 1 to 2 years:
Storage period 2 to 3 years:
Storage period 3 and more years:
No action necessary
Prior to energizing, connect to
voltage for one hour
Prior to energizing, form
according to the curve
Prior to energizing, form
according to the curve
Voltage
Time t [h]
Figure 2-1
Forming
Содержание COMBIMASTER 411
Страница 40: ...2 Installation Issue 03 01 MICROMASTER 411 COMBIMASTER 411 Operating Instructions 40 6SE6400 5CA00 0BP0 ...
Страница 60: ...3 Commissioning Issue 03 01 MICROMASTER 411 COMBIMASTER 411 Operating Instructions 60 6SE6400 5CA00 0BP0 ...
Страница 92: ...6 Troubleshooting Issue 03 01 MICROMASTER 411 COMBIMASTER 411 Operating Instructions 92 6SE6400 5CA00 0BP0 ...
Страница 98: ...7 Specifications Issue 03 01 MICROMASTER 411 COMBIMASTER 411 Operating Instructions 98 6SE6400 5CA00 0BP0 ...
Страница 102: ...8 Options Issue 03 01 MICROMASTER 411 COMBIMASTER 411 Operating Instructions 102 6SE6400 5CA00 0BP0 8 4 PROFIBUS Module ...
Страница 103: ...Issue 03 01 8 Options MICROMASTER 411 COMBIMASTER 411 Operating Instructions 6SE6400 5CA00 0BP0 103 8 5 EM Brake Module ...
Страница 154: ......
Страница 162: ...MICROMASTER 411 COMBIMASTER 411 Operating Instructions 162 6SE6400 5CA00 0BP0 ...
Страница 163: ...Issue 03 01 Geräteansicht MICROMASTER 411 COMBIMASTER 411 Operating Instructions 6SE6400 5CA00 0BP0 163 ...