
212/214
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
G
Gas compartment, evacuating.......................................102
Gas compartment, filling...............................................103
Gas compartments..........................................................24
Gas filling, checking......................................................131
Gas pressure, checking ........................................... 60, 131
Gas pressure, monitoring ..............................................131
Gas quality, checking ....................................................131
H
High-voltage connections, checking ..............................133
I
Indications and their meanings .....................................151
Indicators .....................................................................151
Information to Siemens before delivery...........................46
Installation material ........................................................46
Installation of short-circuit bridge, bus sectionalizer ........83
Installation with gas work ...............................................95
Installation work, checks...............................................147
Installation, voltage transformer 4MT3..........................107
Installation, cables with plugs .......................................134
Installation, earthing busbar ...........................................79
Installation, end wall.....................................................142
Installation, final work ..................................................134
Installation, low-voltage cables .....................................134
Installation, panel connections .......................................97
Installation, panel connections supplied separately..........97
Installation, preparing.....................................................46
Installation, short-circuit bridge,
panel connection housing...............................................80
Installation, solid-insulated bars ....................................104
Installation,
solid-insulated bars at the panel connection ..................103
Installation, tests ..........................................................131
Installation, voltage transformer 4MT7 .........................113
Installation, voltage transformer 4MU4 .........................111
Installation, voltage transformers..................................106
Insulating gas .................................................................35
Integrated varistor ..........................................................34
Interlocks......................................................................154
Intermediate storage ......................................................50
IP31D ...........................................................................136
IPX1..............................................................................136
L
Leakage test .................................................................131
Lubricants.....................................................................207
M
Maintenance unit..........................................................103
Maintenance, bolted joints and seals.............................207
Maintenance,
vacuum circuit-breaker operating mechanism ...............204
Make-proof busbar earthing switch, description ..............20
Make-proof earthing switch, closing..............................194
Make-proof earthing switch, control elements and
indicators .....................................................................193
Make-proof earthing switch, opening............................195
Motor operating mechanism,
rated current of the protection equipment ......................33
Motor operating mechanism, vacuum circuit-breaker ......33
O
Operating times..............................................................32
Operating tools.............................................................153
Operation .....................................................................150
Overview, busbar housing covers, desiccant bags............47
P
Packing...........................................................................50
Panel connection ............................................................25
Panel connection housing, installation,
short-circuit bridge .........................................................80
Panel interconnection, 5000 A busbar .............................84
Panel interconnection, twin busbar .................................84
Panel versions.................................................................12
Panel, earthing ...............................................................81
Panels, lining up .............................................................71
Partition class .................................................................37
Personal protection...........................................................8
Personal protective equipment (PPE) .................................8
Phase sequence ..............................................................38
Power-frequency voltage test..........................................95
Power-frequency voltage test on site.............................105
PPE ...................................................................................8
Protection and control equipment ...................................27
Protective equipment........................................................8
Q
Qualified personnel.........................................................10
R
Rating plates...................................................................39
Rear walls of switchgear, installation.............................139
Recycling ......................................................................209
Removal, voltage transformer 4MT7 .............................121
Removal, voltage transformer 4MU4 ............................119
Removal, voltage transformers......................................116