Chapter 6) 7SR158 Commissioning and Maintenance Guide
©2013 Siemens Protection Devices Limited
Chapter 6 Page 7 of 24
When using settings groups it is important to remember that the relay need not necessarily be operating
according to the settings that are currently being displayed. There is an ‘active settings group’ on which the relay
operates and an ‘edit/view settings group’ which is visible on the display and which can be altered. This allows the
settings in one group to be altered from the relay fascia while the protection continues to operate on a different
unaffected group. The ‘Active Settings Group’ and the ‘Edit Settings Group’ are selected in the ‘System
Configuration Menu’.
The currently Active Group and the group currently Viewed are shown at the top of the display in the Settings
display screen. If the View Group is not shown at the top of the display, this indicates that the setting is common
to all groups. CT/VT ratio, I/O mapping and other settings which are directly related to hardware are common to
all groups.
If the relay is allowed to trip during testing then the instruments display will be interrupted and replaced by the
‘Trip Alert’ screen which displays fault data information. If this normal operation interferes with testing then this
function can be temporarily disabled for the duration of testing by use of the Trip Alert Enabled/Disabled setting in
the System Config Menu.
After applying a settings change to the relay, which may involve a change to the indication and output contacts,
the
TEST/RESET
key should be pressed to ensure any existing indication and output is correctly cleared.
1.3
Tests
1.3.1
Inspection
Ensure that all connections are tight and correct to the relay wiring diagram and the scheme diagram. Record any
deviations. Check that the relay is correctly programmed and that it is fully inserted into the case. Refer to
‘Section 2: Settings and Instruments’ for information on programming the relay.
1.3.2
Secondary Injection Tests
Select the required relay configuration and settings for the application.
Isolate the auxiliary D.C. supplies for alarm and tripping from the relay and remove the trip and intertrip links.
Carry out injection tests for each relay function, as described in this document
1.3.3
Primary Injection Tests
Primary injection tests are essential to check the ratio and polarity of the transformers as well as the secondary
wiring.
1.3.4
Putting into Service
After tests have been performed satisfactorily the relay should be put back into service as follows:-
Remove all test connections.
Replace all secondary circuit fuses and links, or close m.c.b.
Ensure the Protection Healthy LED is on, steady, and that all LED indications are correct. If necessary press
CANCEL
until the Relay Identifier screen is displayed, then press
TEST/RESET
to reset the indication LEDs.
The relay meters should be checked in Instruments Mode with the relay on load.
The relay settings should be downloaded to a computer and a printout of the settings produced. The installed
settings should then be compared against the required settings supplied before testing began. Automated setting
comparison can be carried out by Reydisp using the
Compare Settings Groups
function in the
Edit
menu. Any
modified settings will be clearly highlighted.
Содержание 7SR158 Argus
Страница 1: ...Answers for energy 7SR158 Argus Voltage and Frequency Relay Reyrolle Protection Devices ...
Страница 2: ......
Страница 4: ...7SR158 Argus Contents ...
Страница 10: ...Chapter 1 7SR158 Description of Operation Chapter 1 Page 6 of 38 2014 Siemens Protection Devices Limited ...
Страница 44: ...Chapter 2 7SR158 Technical Manual Chapter 2 Page 2 of 16 2013 Siemens Protection Devices Limited ...
Страница 46: ...Chapter 2 7SR158 Technical Manual Chapter 2 Page 4 of 16 2013 Siemens Protection Devices Limited ...
Страница 60: ...Chapter 3 7SR158 Performance Specification Chapter 3 Page 2 of 24 2013 Siemens Protection Devices Limited ...
Страница 62: ...Chapter 3 7SR158 Performance Specification Chapter 3 Page 4 of 24 2013 Siemens Protection Devices Limited ...
Страница 82: ...Chapter 3 7SR158 Performance Specification Chapter 3 Page 24 of 24 2013 Siemens Protection Devices Limited ...
Страница 84: ...Chapter 4 7SR158 Data Communications Chapter 4 Page 2 of 66 2013 Siemens Protection Devices Limited ...
Страница 88: ...Chapter 4 7SR158 Data Communications Chapter 4 Page 6 of 66 2013 Siemens Protection Devices Limited ...
Страница 102: ...Chapter 4 7SR158 Data Communications Chapter 4 Page 20 of 66 2013 Siemens Protection Devices Limited ...
Страница 114: ...Chapter 4 7SR158 Data Communications Chapter 4 Page 32 of 66 2013 Siemens Protection Devices Limited ...
Страница 138: ...Chapter 4 7SR158 Data Communications Chapter 4 Page 56 of 66 2013 Siemens Protection Devices Limited ...
Страница 140: ...Chapter 4 7SR158 Data Communications Chapter 4 Page 58 of 66 2013 Siemens Protection Devices Limited ...
Страница 150: ...Chapter 5 7SR158 Installation Guide Chapter 5 Page 2 of 14 2013 Siemens Protection Devices Limited ...
Страница 152: ...Chapter 5 7SR158 Installation Guide Chapter 5 Page 4 of 14 2013 Siemens Protection Devices Limited ...
Страница 164: ...Chapter 6 7SR158 Commissioning Maintenance Guide Chapter 6 Page 2 of 24 2013 Siemens Protection Devices Limited ...
Страница 188: ...Chapter 7 7SR158 Applications Guide Chapter 7 Page 2 of 24 2014 Siemens Protection Devices Limited ...
Страница 211: ......