![Siemens 3AH35-SE Series Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/siemens/3ah35-se-series/3ah35-se-series_instruction-manual_375494035.webp)
35
Current rating
A
Contact
resistance
Micro-Ohms
1,200
35
2,000
30
2,500
30
3,000
30
Table 5: Maximum contact resistance
Inspection and cleaning of circuit breaker
insulation
1. Perform the spring-discharge check (refer
to page 6) on the circuit breaker after all
control power is removed. The spring-
discharge check consists of:
a) Pressing the red open pushbutton
b) Pressing the black close pushbutton
c) Pressing the red open pushbutton
again.
All of these controls are on the circuit
breaker front panel (refer to Figure 1:
Operator panel controls of circuit breaker
and manual charging of closing spring on
page 8). Visually verify the discharged
condition of the springs.
2. Remove any inter-phase barriers if
furnished (applicable for certain types
only).
3. Clean barriers and post insulators using
clean cloth dipped in isopropyl alcohol.
4. Reinstall all barriers. Check all visible
fasteners again for condition and
tightness.
Note:
Do not use any cleaning compounds
containing chlorinated hydrocarbons, such as:
trichlorethylene, perchlorethylene or carbon
tetrachloride.
These compounds will damage the phenylene
ether copolymer material used in the barriers
and other insulation on the circuit breaker.
Functional tests
Refer to the installation checklist in the
installation checks and initial functional
tests section of this instruction manual
(refer to pages 6-7). Functional tests consist
of performing at least three manual spring-
charging checks and three automatic spring-
charging checks. After these tests are
complete, and the springs are fully
discharged, all fasteners and connections
are checked again for tightness and
condition.