Chapter 1
Introduction
4
Overview
4
Scope
4
Parts Illustration
5
Chapter 2
Receiving, Handling & Storage
6
Receiving
6
Identification
6
Inspection and Unpacking
6
Shipping Damage Claim Procedure
6
Handling
7
Storage
7
Chapter 3
Installation
8
Preparation for Installation
8
Lighting Control Assembly Layout
9
P1 Enclosure Mounting Installation
10
P1 Interior with i-3 Control Technology Installation
10
Additional BQD Breaker and CPOD Installation
11
Location for Low Voltage Conduit
11
Wiring Installation
12
Configuring i-3 Controller
12
Deadfront Installation
12
Trim/Door Installation
12
Chapter 4
Inspection and Testing
13
Overview
13
Inspection
13
Testing
13
Energizing
13
System Diagnostic Test
13
Chapter 5
Maintenance
14
Chapter 6
System Components
15
BQD Breaker
15
- Description
15
- Installing BQD breakers into panel
16
- Removing BQD breakers from panel
17
Control POD (CPOD)
17
- Description
17
- Installing CPOD into panel
20
- Removing CPOD from panel
21
Data Rail
21
- Description
21
- Installing data rail into panel
22
- Removing data rail from panel
23
Neutral Extension
23
- Description
23
- Installing neutral extension into panel
24
- Removing neutral extension from panel
24
i-3 Controller
25
- Description
25
- Installing i-3 controller into panel
26
- Removing i-3 controller from panel
27
Ribbon Cables
27
- Description
27
- Ribbon cable connections
28
P1 Panel with i-3 Control Technology
Table of Contents
2