Sleeve conduits for input and
communication wiring barriers are
provided during the shipment of the
panel with i-3 Controller.
Wiring Installation
For electrical load wiring information,
refer to Breaker rating label located
on the face of the breaker.
For ground wire installation, ground
wire needs to be installed after the
panel enclosure is mounted on the
wall and the P1 interior is installed.
Ground wire will not be installed at
the factory. Ground terminations to
the enclosure should be made after
the P1 interior is installed in the
enclosure to prevent physical
interference with wires.
Configuring i-3 Controller
For complete detail on i-3 controller
configuration, refer to "i-3 I/O
Controller User Guide", P/N: 12-A-
1095-01 for the i-3 I/O Controller or
"i-3 System Controller User Guide",
P/N: 12-A-1095-02 for i-3 System
Controller.
Deadfront Installation
Prior to completing the installation of
panel dead front and trim, first
examine the Inspection section in
Chapter 3
Installation
Chapter 4 - Inspection and Testing.
1.Make sure the dead front is
installed prior to closing of the
panel.
2.Insure that all breakers extend
properly through the dead front
openings and any provisions or
spaces are properly covered with
dead front fillers. Normal unit space
opening may use QF3 filler plates.
Trim/Door Installation
For trim/door installation, refer to
"Trim Mounting Instructions", which is
provided during the shipment of the
trim.