Chapter
11
Operating Instructions
UE4740
42
©
SICK AG • Industrial Safety Systems • Germany • All rights reserved
8020182/1CUO/2022-08-26
Subject to change without notice
Annex
11.5
Manufacturers checklist
Checklist for the manufacturer/installer for installation of the EFI gateway
The specifications for the following items listed must be available at least for the initial
commissioning. They are dependent on the application, whose requirement must be
checked by the manufacturer/installer.
This checklist should be retained/stored with the machine documentation so that you
can use it as a reference for periodical tests.
1.
Have the safety rules and regulations been observed in compliance
with the directives/standards applicable to the machine?
Yes
No
2.
Are the applied directives and standards listed in the declaration of
conformity?
Yes
No
3.
Does the protective device comply with the required PL/SIL claim
limit and PFHd in accordance with EN ISO 13849-1/EN 62061 and
the required type in accordance with IEC 61496-1?
Yes
No
4.
Are the required protective measures against electric shock in
effect (protection class)?
Yes
No
5.
Has the protective function been checked in compliance with the
test notes in this documentation? Especially:
Functional check of the encoders, sensors and actuators at the
EFI gateway
Test of the switch-off paths
Yes
No
6.
Are you sure that the EFI gateway was tested fully for safety
functionality after each configuration change?
Yes
No
This checklist does not replace initial commissioning and regular tests by qualified
safety personnel.