Preparations for Initial Start-up
Su
bj
ec
t t
o c
han
ge
w
ith
ou
t n
ot
ic
e
3.4
Transport and installation
●
Only transport the device upright.
Install the device with suitable hoisting equipment (for example a crane) (device weight
approx. 260 kg).
Use the lugs on the top cover.
Immediately screw the device to the floor to secure it against falling over.
3.5
Laying the gas lines
Fig. 5
Gas connections on the right cabinet side (example MERCEM300Z)
The device may only be transported and installed by skilled persons who,
based on their training and knowledge as well as knowledge of the relevant
regulations, can assess the tasks given and recognize the dangers involved.
WARNING:
Hazards through leaky gas path
●
Health risk when noxious sample gas leaks out.
●
Risk of damage to the device and adjacent equipment if the sample gas is
corrosive or could create corrosive liquids in combination with water (e.g.
humidity).
●
The measured values could possibly be wrong if the gas path is leaky.
●
Protect gas lines against frost.
The gas lines to the device may only be laid by skilled persons who, based
on their training and knowledge as well as knowledge of the relevant regu-
lations, can assess the tasks given and recognize the dangers involved.
Connection of the gas lines to the device may only be performed by SICK
Customer Service.
WARNING:
Risk of explosions when explosive sample gas is used
Do not use the device for measuring combustible or explosive gases.
Heated sample gas line inlet, drilled hole 50 mm
MERCEM300Z:
Instrument air feed on device base:
M screw connection M16*1.5 D5-10
MERCEM300Z Indoor:
Instrument air feed on right side panel:
M screw connection M16*1.5 D5-10
Test gas feed into the device via the gas sampling system