Commissioning
38
MCS100E Operating Instructions 8009504/VYWA7/V3-1/2018-01 © SICK AG
Su
bj
ect
to
ch
an
ge
with
ou
t n
otic
e
4.1
Commissioning
As soon as connected to line power (power plug connected), MCS100E automatically starts
operation.
In particular, check before power-on:
– Power voltage adjustment (
– Fuse ratings (depend on voltage) (
).
– Correct connection of the sample gas lines (
).
– Correct connection of the fiber optical cables (
).
For connection to line power, a grounded cord connector is used (the MCS100E does
not have a power switch).
Figure 16
Power connection at the bottom of MCS100E
The MCS100E is supplied with all parameters set.
It will start operating immediately after power-on.
NOTICE:
If a cold instrument is installed in a warm environment, there is a risk of
condensation inside the instrument.
Allow the instrument to stand for approx. 24 h to adopt ambient
temperature before switching on the supply voltage.
NOTICE:
The heating-up time of MCS100E is approx. 4 h.
Do not apply condensing gas to the instrument before the end of the
heating-up time.
Power connection
L
N
PE
Содержание MCS100E
Страница 1: ...O PERATING INSTRU CTIO NS MCS100E IR Analyzer Title Page Commissioning Operation Maintenance...
Страница 10: ...Contents 10 MCS100E Operating Instructions 8009504 VYWA7 V3 1 2018 01 SICK AG...
Страница 98: ...Operation 98 MCS100E Operating Instructions 8009504 VYWA7 V3 1 2018 01 SICK AG Subject to change without notice...
Страница 112: ...Maintenance 112 MCS100E Operating Instructions 8009504 VYWA7 V3 1 2018 01 SICK AG Subject to change without notice...