![SICK deTem4 Core Ex Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/sick/detem4-core-ex/detem4-core-ex_operating-instructions-manual_1264385021.webp)
Figure 12: No potential difference between load and protective device
DANGER
Hazard due to lack of effectiveness of the protective device
In the case of non-compliance, it is possible that the dangerous state of the machine
may not be stopped or not stopped in a timely manner.
Downstream contactors must be positively guided and monitored depending on applic‐
able national regulations or required reliability of the safety function.
b
Make sure that downstream contactors are monitored (external device monitoring,
EDM).
b
Because the multiple light beam safety device does not have integrated external
device monitoring, this must be implemented in the external control, if required.
Requirements for the electrical control of the machine
Both outputs are short-circuit protected to 24 V DC and 0 V. When the light path is
clear, the OSSDs are in the ON state. When a switch-off condition is present (e.g., inter‐
ruption in the light path), the OSSDs are in the OFF state. In the event of a device fault,
at least one OSSD is in the OFF state.
The multiple light beam safety device complies with the rules for electromagnetic com‐
patibility (EMC) for the industrial sector (Radio Safety Class A). Radio interference can‐
not be ruled out when used in residential areas.
DANGER
Hazard due to lack of effectiveness of the protective device
In the case of non-compliance, it is possible that the dangerous state of the machine
may not be stopped or not stopped in a timely manner.
b
Make sure that the following control and electrical requirements are met so that
the multiple light beam safety device can fulfill its protective function.
•
The external voltage supply of the multiple light beam safety device must be capa‐
ble of buffering brief power failures of 20 ms as specified in IEC 60204-1.
•
The power supply unit must provide safe isolation according to IEC 61140
(SELV/PELV). Suitable power supply units are available as accessories from SICK,
PROJECT PLANNING
4
8020453/14Q7/2020-04-27 | SICK
O P E R A T I N G I N S T R U C T I O N S | deTem4 Core
21
Subject to change without notice