10.
3.
Plumb a clean source of regulated compressed gas of either CO2, Nitrogen, or filtered shop air to the
water inlet connection of the pump. Remove the pump from its mounting by loosening the two (2)
screws in the bracket slots. Turn the pump upside down (Inlet/Outlet ports pointing down) over a
bucket.
4.
Apply gas at
low pressures
(5-15 psi.[.35-1.0 bar]) to the water inlet port of the pump allowing it to
cycle slowly until all the water trapped within the chambers is expelled. Turn the air off, remove the air
line, and reinstall the pump to its mounting.
5.
Open the dispenser valve(s) and expel all the solution from both the water and concentrate lines with
the compressed air. (Refer to the equipment manufacturer's recommendations for purging dispensers
and lines.) Reconnect all line fittings properly. Leave the inlet water source valve off and
DO NOT
reinstall Q.C.D. to concentrate container until the system is to be restarted.
NOTE:
When the system is to be placed back into service, it
MUST
have the "Sanitizing Procedure"
performed before finished drinks can be dispensed.
RETURN POLICY
Before a BRIX pump is returned to the factory, it
MUST
be sanitized/flushed when removed from
service to prevent mold growth and health hazards.
BRIX pump that do not receive periodic
sanitization may be deemed as non-repairable. For pumps that do not operate, warm water from a faucet
must be run through inlet fitting ports as soon as it is removed (see SHURflo Service Bulletin #1046).
Pumps that are returned to SHURflo that are not sanitized/flushed will be dispositioned as a
"scrapped
pump"
and
will not
be considered for testing, repair, or recondition.
When BRIX pumps are being returned to a service center, please contact the appropriate location prior to
shipment to initiate a "Return Goods Authorization". SHURflo manufactures the BRIX pump components
as needed per factory orders and service requirements, therefore when sending in a large number at one
time, a 30 day "turn-a-round" or more could be expected.
RECONDITION PROGRAM
(U.S. Market)
SHURflo service centers provide a remanufacturing program for BRIX pumps that are out of warranty.
This service is provided depending on the pumps condition and results of the performance test. SHURflo
service personnel will inform you as to cost and lead-time prior to initiating any work.
Returns may to be shipped with the postage prepaid to either of our service centers: SHURflo East,
Elkhart, IN or SHURflo, Cypress, CA). Package all returns carefully. SHURflo will not be responsible for
freight damage incurred during shipping to a service center. SHURflo reserves the right to the final
disposition as to the condition of a pump returned for recondition.
A rebuild includes: new poppet assembly, plunger seals, valves, O-rings, fittings and any components
necessary to update the pump to the latest specification.
All pumps receive a complete factory performance test and are sanitized per NSF listed requirements
prior to shipping. All remanufactured BRIX pumps include a one (1) year warranty of similar intent as that
of a new BRIX pump.