P/N 1128479 Rev. A
5
Control Box Installation
STEP 4:
Remove electrical tape from positive battery terminal.
Connect red wire to positive battery terminal inside
control box.
STEP 5:
Check battery voltage. If voltage is less than 12.2
volts (about 50% charged), complete trickle charger
installation and allow battery to charge for 15 minutes
before proceeding with actuator installation.
STEP 1:
Mount control box
1
above hinge bracket. Drill holes
and install fasteners. For wooden posts, 3/8" lag
screws can be used. For metal posts, use 3/8" self-
tapping screws.
STEP 2:
Loosen four #10 fasteners on side holding front panel
with 5/16" nut driver. Remove front panel.
STEP 3:
Loosen two #10 fasteners on bottom of control box and
remove bottom cover for access to cable connectors.
Gently pull out cables.
●
If using 3/8" self-tapping screws, drill 5/16" holes.
●
If using 3/8" lag screws, drill 1/4" holes.
hinge
bracket
or
1
cables
bottom
cover
red
wire
remove
tape
5
C
D
Содержание AutoGate
Страница 1: ...P N 1128479 Rev A AutoGate Electric Farm Swing Gate Trickle Charge Version ...
Страница 13: ...P N 1128479 Rev A Notes 10 ...
Страница 14: ...P N 1128479 Rev A Notes 11 ...
Страница 15: ...P N 1128479 Rev A Notes 12 ...
Страница 16: ......