Solar working station operation manual SR881
- 4 -
Solar pump station installation and operation manual
1. Solar pump station with integrated controller
Integrated solar controller
outstanding design
Safety assembly with safety valve and manometer
High-Quality casing for reduce heat loses
Flow rate check
1.1 Scope of delivery
1* solar pump station
1* integrated solar controller
1* flushing and filling unit (option)
1* collector sensor PT1000
2* store sensor NTC10K
1* wall mounting bracket
1* accessory bag
(
include 2 * screw and dowel ; 2 * strain relief
)
1* manual
1.2 About this manual
This solar pump station is a preinstalled and leak-tested group of fitting for transferring heat
from the collector to the store. It contains important fittings and safety devices for the
operation of the solar thermal system:
Ball valves in flow and return in combination with check valves to prevent gravity
circulation.
Flow rate check for displaying the flow rate
Manometer for displaying the system pressure
Safety valve to prevent inadmissible overpressure
Flushing and filling unit (optional) for flushing, filling and emptying the solar thermal
system.
1.3 Safety instructions
The installation and commissioning of the solar station as well as the connection of
electrical components requires technical knowledge commensurate with a recognized
vocational qualification as a fitter for plumbing, heating and air conditioning technology, or
a profession requiring a comparable level of knowledge. The following must be observed