Installing the De-icer System (if applicable)
44
f. Inside each junction box, connect the leads as shown in
, using wire
nuts (7) to secure the connections.
g. Repeat for the remaining bays, junction boxes, and interbay cables.
h. Secure the interbay cables to the mounting pipe or tower leg, using tie-
wraps.
i. Connect the 10-foot pigtail at the bottom of the bottommost junction box.
Installing the tower
junction box
CAUTION
It is important to ground both the tower junction box and the control
box, as shown in the schematic diagrams.
a. Furnish a tower junction box as shown schematically in
the antenna’s de-icer harness to the main power.
b. Run the ten-foot de-icer pigtail to the tower junction box and secure it to the
mounting pipe and/or the tower.
Installing the thermostat
(if applicable)
If you are using a thermostat, you may locate and mount it at your discretion.
We recommend mounting it as close as practical to the antenna.
CAUTION
When testing the thermostat, be sure to have one or both thermostat
leads disconnected before taking resistance readings. Otherwise, read-
ings may be affected by other components.
a. Before you connect the thermostat, measure the resistance across the
thermostat circuit and from it to ground to ensure that there are no short-
circuits. Thermostat readings should be as shown in
b. Mount the thermostat near the antenna and connect the thermostat leads to
points S1 and S2 in the control box as shown in the schematic diagram,
Table 4. Thermostat readings
Reading
Location
Ambient
Temperature
Resistance =
0 ohms
(short circuit)
Resistance =
infinite ohms
(open circuit)
Leg-to-
Ground
Any
Defective thermo-
stat or shorted
leads
OK
Leg-to-Leg
Above about 38° F
(3.3° C)
Defective thermo-
stat or shorted
leads
OK
Between about 10°
and about 38° F
(-6.7° to 3.3° C)
OK
Defective thermo-
stat or broken leads
Below about 10° F
(-6.7° C)
Defective thermo-
stat or shorted
leads
OK
Содержание 6822
Страница 4: ......
Страница 11: ...3 Preparation Figure 1 Mounting options ...
Страница 12: ...Preparation 4 Figure 2 Tower layout single antenna bay ...
Страница 19: ...11 Preparation Figure 9 Top mounted installation ...
Страница 20: ...Preparation 12 Figure 10 Proper and improper securing of bay cables ...
Страница 26: ......
Страница 30: ......
Страница 33: ...25 Connecting the Antenna 2 to 6 bay Figure 19 Slugged line section installation if applicable ...
Страница 35: ...27 Connecting the Antenna 2 to 6 bay Figure 20 Fine matching transformer installation ...
Страница 40: ...Connecting the Antenna 8 bay 32 Figure 23 Power divider mounting for 8 bay antenna ...
Страница 41: ...33 Connecting the Antenna 8 bay Figure 24 Slugged line section installation if applicable ...
Страница 43: ...35 Connecting the Antenna 8 bay Figure 25 Fine matching transformer installation ...
Страница 46: ...Connecting the Antenna 8 bay 38 Figure 27 Tower transmission line connection ...
Страница 55: ...47 Retuning Figure 37 Optimal VSWR at 108 MHz narrow feedstrap ...
Страница 56: ...Retuning 48 Figure 38 Optimal VSWR at 108 MHz wide feedstrap ...
Страница 57: ...49 Retuning Figure 39 Optimal VSWR at 88 MHz wide feedstrap ...
Страница 58: ......
Страница 62: ...Startup 54 Figure 41 Apply the signal ...
Страница 64: ......
Страница 66: ...Parts 58 Figure 42 Components 6822 bay without de icers ...
Страница 70: ...Parts 62 Figure 45 Components mounts for 3 1 2 to 6 mounting pipe ...
Страница 72: ...Parts 64 Figure 46 Feed system components for 2 to 6 bay antennas ...
Страница 75: ...67 Parts Figure 47 Feed system components 8 bay antenna ...
Страница 77: ...69 Parts Figure 48 Slugged line section if applicable components ...
Страница 78: ...Parts 70 Figure 49 Fine matching transformer optional components ...