18(44)
Note: Power connection must be conducted by professional electricians!
Do not change the circuit of the water chiller without our company's
authority. If the machine is damaged by unauthorized change we are not
responsible for this.
3.2 Select Installation Site
1) No heat source existence nearby to acoid efficiency reduction due to
absorbing hot air.
2) No impact imposed by high temperature, vapor or oil stain.
3) Avoid being spattered by water vapor when choosing installation site near
cooling water tower, so to avoid any short ciruit or creepage.
4) Proper ventilation without hindrance for air inhaled exhaled.
5) No existence of inflammable substance.
6) When using concrete bearing platform, the platform must be firm and flat.
Install shockprooof mat in the bolt of bearing platform if necessary.
7) Set apart some service space.Space ranges are recommended as shown in
figure 3-1.
Length unit: mm
Picture 3-1: Installation Space
Содержание SICC-120A-R2
Страница 1: ...SICC A R2 CFC free Refrigerant Air cooled Central Water Chiller Date Nov 2017 Version Ver B English...
Страница 2: ......
Страница 6: ...6 44...
Страница 10: ...10 44 1 3 Technical Specifications 1 3 1 SICC A R2 Series Outline Dimensions SICC 60A R2 SICC 90A R2...
Страница 11: ...11 44 SICC 120A R2 Picture 1 1 Outline Dimensions 1 3 2 Flange Picture 1 2 Flange Outline Dimensions...
Страница 43: ...43 44 Attachment Electrical Diagram...
Страница 44: ...44 44...