![Shimadzu AGS-100NX Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/shimadzu/ags-100nx/ags-100nx_instruction-manual_1256925044.webp)
Chapter 3 Basic Instructions
3-6
3.2 Installation Site Precautions
1. Installation Site Environment
1) Provide a table with ample load capacity to hold the total weight of the AGS-X unit, jigs,
and other items.
2) Level the AGS-X unit after placing it in position. If using a specialized Shimadzu table,
leveling screws are provided on the ends of the legs.
3) Avoid using the system in locations with significant temperature variations.
Keep the temperature within the +5
C to +40
C range and relatively constant during
tests.
4) Avoid using the system in locations with high humidity.
Keep humidity within the 20% to 80% range, with no condensation.
5) Avoid using the system in dusty locations.
6) Avoid locations near sources of vibration.
The allowable maximum is 10 Hz frequency and 0.5
m amplitude.
7) Avoid locations near equipment that generate electromagnetic induction.
Avoid locations near high frequency equipment, which can affect highly sensitive load
cells, amplifiers, and other items included with the AGS-X unit.
8) Avoid locations with corrosive gases, steam, direct sunlight, or other conditions
detrimental to functionality.
2. Power Supply Requirements
(1) Power Supply Voltage
Single phase, 100/120/220/240 V AC switchable
Switch Setting
Nominal Voltages
100 V
100/110 V
120 V
115/120/125/127 V
220 V
200/220/230 V
240 V
240 V
(2) Power Supply Frequency
50/60 Hz
(3) Power Supply Capacity
1.2 kVA
(4) Power Consumption
300 W
(5) Short Circuit Current Rating 1.5 kA
(6) Ground
Type-D or better ground. Please keep equipotential ground.
(Grounding resistance of max. 100 ohm)
When connecting the main unit, optional device, and PC to separate power supplies, make
sure that there is no potential difference between all the protective ground terminals. (AC / DC
less than 10V)
Содержание AGS-100NX
Страница 2: ...This page is intentionally left blank...
Страница 16: ...Before Using the System xiv This page is intentionally left blank...
Страница 20: ...Contents xviii This page is intentionally left blank...
Страница 21: ...1 1 Chapter 1 Overview CONTENTS 1 1 Introduction 1 2 1 2 AGS X Unit Specifications 1 3...
Страница 27: ...2 1 Chapter 2 Part List Specifications CONTENTS 2 1 AGS X Unit 2 2 2 2 Peripheral Equipment 2 3...
Страница 38: ...Chapte 2 Part List Specifications 2 12 This page is intentionally left blank...
Страница 56: ...Chapter 3 Basic Instructions 3 18 This page is intentionally left blank...
Страница 118: ...Chapter 5 Performing Tensile Tests 5 12 This page is intentionally left blank...
Страница 126: ...Chapter 6 Performing Compression and Bending Tests 6 8 This page is intentionally left blank...
Страница 127: ...7 1 Chapter 7 Method Files CONTENTS 7 1 Introduction 7 2 7 2 File Operations 7 2 7 3 Computer File Operations 7 3...
Страница 130: ...Chapter 7 Method Files 7 4 This page is intentionally left blank...
Страница 131: ...8 1 Chapter 8 Control Input Output CONTENTS 8 1 Introduction 8 2 8 2 Registering Optional Devices 8 3...
Страница 134: ...Chapter 8 Control Input Output 8 4 This page is intentionally left blank...
Страница 142: ...Chapter 9 Sensor Input Output 9 8 This page is intentionally left blank...
Страница 146: ...Chapter 10 Maintenance and Inspection 10 4 This page is intentionally left blank...