background image

23

www.shieldglobal.com

WARNINGS

The SHIELD Sprinklers must be installed and maintained
in compliance with this document. Depressurize and drain

the  piping  system  before  attempting  to  install,  remove, 

or adjust any Sprinklers. Failure to do so may impair the
performance of these sprinklers. The owner is responsible
for maintaining the re protection system and devices in
operation.

WRENCH DESCRIPTION

The Sprinkler Wrench is a tool speci cally designed for
installing SHIELD Sprinklers. These special wrenches must

be used to provide the proper leverage when tightening the 

sprinkler and to minimize slippage during installation. Any
other wrench may damage the sprinkler.

INSTALLATION

All  SHIELD  Sprinklers  must  be  installed  according  to 

NFPA 13 Standards. Deviations from these requirements

and  standards or any  alteration to  the  sprinkler  itself will 

void any warranty made by manufacturer. In addition,

installation  must  also  meet  local  government  provisions, 

codes and standards as applicable.

The system piping must be properly sized to insure the
minimum required ow rate at the sprinkler. Check for the
proper model, style, ori ce size and temperature rating
prior to installation. Install sprinklers after the piping is in

place to avoid mechanical damage, replace any damaged 

units. Wet pipe systems must be protected from freezing.

Upon completion of the  installation,  the  system  must  be 

tested per recognized standards. In the event of a thread

task, remove the unit, apply new pipe joint compound or 

tape, and reinstall.

ADDITIONAL

Cover Plate - To install the conceal cover plate, align it

with the sprinkler and slowly turn clockwise for the cover 

plates and sprinkler to lock in. Make sure the cover plate is

securely locked in, fail to do so may cause the sprinkler to 

malfunction.

INSTALLATION SEQUENCE

Step 1. The unit must be installed in the Pendent position
for the Concealed Sprinkler.

Step 2. Use only a non-hardening pipe joint compound or
tape seal. Apply only to the male
threads.

Step 3. Hand tighten the sprinkler into tting.

Step 4. For Concealed Sprinklers, use a standard wrench.
Tighten the unit into the tting. A lead-tight joint requires
only 7 to 14ft.-lbs(9.5 to 19.0Nm) of torque. A tangential
force of 14 to 28ft.-lbs(62.3 to124.5N) delivered through
a 6”(150mm) handle will deliver adequate torque. Once
torque level reach over 21ft.-lbs(28.6Nm) it may distort
the ori ce seal, resulting in leakage. For exposed piping

systems,  the  sprinkler  should  be  oriented  so  the  frame 

arms are parallel with the branch line pipe.

CAUTION

Do  not  over-tighten  or  under-tighten  the  sprinkler  to 

compensate for inaccurate escutcheon plate adjustment.
Protection caps are used to protect its bulb and de ector.

Please have cap on at all times during transportation and 

interior decorating.

MAINTENANCE

 

Sprinklers must never be altered after manufacture. Any

alteration  such as painting  and  coating will directly harm 

the sprinkler and cause malfunctions. Sprinkler in contact

with corrosive products should be replaced if they cannot 

be cleaned completely.

Visual inspections are recommended after installation.

After  installation,  a  close-up  inspection  annually  will 

suf ce.

Inspection and maintenance of re protection system is
the responsibility of the owner. It is recommended that

automatic  sprinkler  system  be  inspected  and  tested 

according to local and/or national regulations.

Concealed
Sprinkler Wrench

Содержание SD1010

Страница 1: ...rature of the sprinkler the bulb shatters As a result the waterway is cleared of all sealing parts and water is discharged towards the de ector The de ector is designed to distribute the water in a pattern that is most effective in controlling the re MAXIMUM COVERAGE Standard spray coverage is up to Light Hazard 225 square feet 20 9 sq m Ordinary Hazard 130 square feet 12 1 sq m per NFPA 13 TECHNI...

Страница 2: ...7 www shieldglobal com PART LIST DISCHARGE CURVE SD1015 SD1010 SD1030 SD1032 1 Frame 2 De ector 3 Cap 4 Cap Seat 5 Load Screw 6 Seal 7 Bulb ...

Страница 3: ...and push or thread over the sprinkler body into the upper support piece until the outer edge of the escutcheon meets the mounting surface INSTALLATION SEQUENCE Step 1 The unit must be installed in the upright position for the Upright Sprinklers and in the Pendent position for the Pendent Sprinkler Pendent Recessed Sprinkler Step 2 Use only a non hardening pipe joint compound or tape seal Apply onl...

Страница 4: ...9 www shieldglobal com DISTRIBUTION PATTERNS K5 6 PENDENT SPRINKLER DISTRIBUTION PATTERNS TRAJECTORY K5 6 UPRIGHT SPRINKLER DISTRIBUTION PATTERNS TRAJECTORY ...

Страница 5: ...10 www shieldglobal com DIMENSIONS UPRIGHT SPRINKLER PENDENT SPRINKLER RECESSED PENDENT SPRINKLER Maximum Extension Maximum Recess ...

Страница 6: ... the rated temperature of the sprinkler the bulb shatters As a result the waterway is cleared of all sealing parts and water is discharged towards the de ector The de ector is designed to distribute the water in a pattern that is most effective in controlling the re MAXIMUM COVERAGE Standard spray coverage is up to Light Hazard 196 square feet 18 2 sq m Ordinary Hazard 100 square feet 9 3 sq m per...

Страница 7: ...12 www shieldglobal com PART LIST SD1133 SD1121 1 Frame 2 De ector 3 Cap 4 Cap Seat 5 Load Screw 6 Seal 7 Bulb DISCHARGE CURVE ...

Страница 8: ...escutcheon plate align with it and push or thread over the sprinkler body into the upper support piece until the outer edge of the escutcheon meets the mounting surface INSTALLATION SEQUENCE Step 1 The unit must be installed in the horizontal sidewall position for the Horizontal Sidewall Sprinklers Step 2 Use only a non hardening pipe joint compound or tape seal Apply only to the male threads Step...

Страница 9: ...w shieldglobal com DISTRIBUTION PATTERNS K5 6 STANDARD HORIZONTAL SIDEWALL AND RECESSED HORIZONTAL SIDEWALL DISTRIBUTION PATTERNS TRAJECTORY K5 6 STANDARD HORIZONTAL SIDEWALL DISTRIBUTION PATTERNS PLAN VIEW ...

Страница 10: ...15 www shieldglobal com DIMENSIONS RECESSED PENDENT SPRINKLER Maximum Extension Maximum Recess ...

Страница 11: ...onsive liquid During a re the ambient temperature rises causing the liquid in the bulb to expand When the ambient temperature reaches the rated temperature of the sprinkler the bulb shatters As a result the waterway is cleared of all sealing parts and water is discharged towards the de ector The de ector is designed to distribute the water in a pattern that is most effective in controlling the re ...

Страница 12: ...17 www shieldglobal com PART LIST SD2133 SD2121 1 Frame 2 De ector 3 Cap 4 Cap Seat 5 Load Screw 6 Seal 7 Bulb DISCHARGE CURVE ...

Страница 13: ...cheon plate align with it and push or thread over the sprinkler body into the upper support piece until the outer edge of the escutcheon meets the mounting surface INSTALLATION SEQUENCE Step 1 The unit must be installed in the horizontal sidewall position for the Horizontal Sidewall Sprinklers Step 2 Use only a non hardening pipe joint compound or tape seal Apply only to the male threads Step 3 Ha...

Страница 14: ...19 www shieldglobal com DISTRIBUTION PATTERNS K5 6 STANDARD VERTICAL SIDEWALL DISTRIBUTION PATTERNS TRAJECTORY K5 6 STANDARD VERTICAL SIDEWALL DISTRIBUTION PATTERNS PLAN VIEW ...

Страница 15: ...20 www shieldglobal com DIMENSIONS ...

Страница 16: ...reaches the rated temperature of the sprinkler the bulb shatters As a result the waterway is cleared of all sealing parts and water is discharged towards the de ector The de ector is designed to distribute the water in a pattern that is most effective in controlling the re MAXIMUM COVERAGE Standard spray coverage is up to Light Hazard 225 square feet 20 9 sq m Ordinary Hazard 130 square feet 12 1 ...

Страница 17: ...22 www shieldglobal com PART LIST SD1050 SD1055 1 Frame 2 De ector 3 Cap 4 Cap Seat 5 Load Screw 6 Seal 7 Bulb DISCHARGE CURVE ...

Страница 18: ...e sprinkler and slowly turn clockwise for the cover plates and sprinkler to lock in Make sure the cover plate is securely locked in fail to do so may cause the sprinkler to malfunction INSTALLATION SEQUENCE Step 1 The unit must be installed in the Pendent position for the Concealed Sprinkler Step 2 Use only a non hardening pipe joint compound or tape seal Apply only to the male threads Step 3 Hand...

Страница 19: ...24 www shieldglobal com DISTRIBUTION PATTERNS K5 6 PENDENT SPRINKLER DISTRIBUTION PATTERNS TRAJECTORY DIMENSIONS ...

Страница 20: ...he liquid in the bulb to expand When the ambient temperature reaches the rated temperature of the sprinkler the bulb shatters As a result the waterway is cleared of all sealing parts and water is discharged towards the de ector The de ector is designed to distribute the water in a pattern that is most effective in controlling the re MAXIMUM COVERAGE Standard spray coverage is up to Light Hazard 22...

Страница 21: ...26 www shieldglobal com PART LIST SD1021 SD1020 FRAME AND DEFLECTOR FINISH Pendent Brass Chrome White Upright Brass only 1 Frame 2 De ector 3 Cap 4 Cap Seat 5 Load Screw 6 Seal 7 Bulb DISCHARGE CURVE ...

Страница 22: ...27 www shieldglobal com DISTRIBUTION PATTERNS K4 2 PENDENT SPRINKLER DISTRIBUTION PATTERNS TRAJECTORY K4 2 UPRIGHT SPRINKLER DISTRIBUTION PATTERNS TRAJECTORY ...

Страница 23: ...28 www shieldglobal com DIMENSIONS RECESSED PENDENT SPRINKLER PENDENT SPRINKLER UPRIGHT SPRINKLER Maximum Extension Maximum Recess ...

Страница 24: ...he ambient temperature reaches the rated temperature of the sprinkler the bulb shatters As a result the waterway is cleared of all sealing parts and water is discharged towards the de ector The de ector is designed to distribute the water in a pattern that is most effective in controlling the re MAXIMUM COVERAGE Standard spray coverage is up to Light Hazard 229 square feet 20 9 sq m Ordinary Hazar...

Страница 25: ...30 www shieldglobal com PART LIST SD1026 SD1025 1 Frame 2 De ector 3 Cap 4 Cap Seat 5 Load Screw 6 Seal 7 Bulb DISCHARGE CURVE ...

Страница 26: ...h it and push or thread over the sprinkler body into the upper support piece until the outer edge of the escutcheon meets the mounting surface INSTALLATION SEQUENCE Step 1 The unit must be installed in the upright position for the Upright Sprinklers and in the Pendent position for the Pendent Sprinkler Pendent Recessed Sprinkler Step 2 Use only a non hardening pipe joint compouind or tape seal App...

Страница 27: ...32 www shieldglobal com DISTRIBUTION PATTERNS K5 6 CONVENTIONAL SPRINKLER DISTRIBUTION PATTERNS TRAJECTORY K5 6 CONVENTIONAL SPRINKLER DISTRIBUTION PATTERNS TRAJECTORY ...

Страница 28: ...33 www shieldglobal com DIMENSIONS STANDARD CONVENTIONAL SPRINKLER RECESSED CONVENTIONAL SPRINKLER Maximum Extension Maximum Recess ...

Страница 29: ...cheon Plate Double pieces Bright Chrome Finish Painted available upon request Suitable for 1 2 and 3 4 Sprinkler Head HINGED ESCUTECHEONS PLATE FOR PIPE Escutecheon Plate Hinged Bright Chrome Finish Different sizes 1 2 upto 6 SPRINKLER GUARD Steel Nickel Chrome plated Suitable for 1 2 and 3 4 Sprinkler Head SPRINKLER CABINETS Steel painted Red Suitable for 1 2 Sprinkler Head Available for 6 12 24 ...