background image

Page 10

Page 11

05-201133_13-0D

05-201133_13-0D

10. SECURING YOUR COVER:

A. install the “S”- hook from the ratchet assembly into the legs of 

the shelter. Pull the webbing carefully to remove the slack from the 

cover. Do not to pull the webbing through the opposite side of the 

cover. 
B. insert the webbing through the spindle of the ratchet and pull 

tight. See Detail o. Wind the ratchet until the webbing overlaps 

itself. Repeat these steps on the opposite side, then repeat this  

on the back side of the shelter. 
C. When all of the corners are secured, adjust the cover front to 

back so that it is centered. When the cover is centered, tighten all 

of the ratchets. Do this in an “x” pattern to be sure it is tightened 

evenly. See Detail o. 
D. install the cover rails (10110) by inserting them into the pipe 

pockets on each side of the cover. Bolt (10115) the rails to the ribs 

using the 3-way and 4-way clamps as shown in Detail P. Check 

that the rails are evenly spaced 8” above the ground on both 

sides. Push down on the cover rails and connectors, one at a  

time, to tighten the bolted clamps and the cover.

IMPORTANT:

 

Install bolt caps (10150) on exposed bolts on side 

rails and wind braces to prevent injury. 

DETAIL O

OUTSIDE 

CORNER 

vIEw

10115

01010

11102

10115

10111

01010

DETAIL P

NOTE: CHECk THAT  

YOUR COVER IS  

CORRECTLY PLACED  

ON THE FRAME.  

The ShelterLogic

®

 logo should line 

up on the left front and right rear 

corners near the top rail. If the logo 

is not legible and positioned as 

shown as “incorrect”,  the cover has 

not been put on the frame correctly.

CORRECT

INCORRECT

Check and 

tighten Ratchets 

and Cross Rails 

monthly to ensure 

the cover is tight.

Cover Tightening Tip

clamps

clamps

CORNER LEG

MIDDLE LEG

WARNING:

 

Serious injury to persons or property could result if cover is installed and shelter is not 

completed and is left unattended. Shelter must be securely anchored until completed.

10110

A. Review all parts included in the kit.
B. Measure width of door between the zippers to determine size.
C. Assemble pipes in combinations below to fit in bottom pocket of door. 

Slide pipes into one another to assemble.

NOTE:

 

If your model included 

a roll up door kit, follow the 

instructions below. Read all 

instructions before beginning 

assembly.

DOOR KIT INCLUDES:

2 - “s” hooks

2 - plugs for poles

1 - butterfly cleat

2 - screws for cleat

1 - philips head screwdriver bit

1 - pipe, plain end

5 - pipes, swedged end

1 - 100’  rope

D. fill pipe with sand for added weight and insert plugs. Slide pipe into pocket 

at bottom of door.
e. Attach cleat with screws, inside shelter, to second vertical rib, about 8” 

down from cross rail on either side. See Detail A. 
f. Cut a small slit/hole, approximately 18” in from zipper, on the outside of the 

cover, just above the webbing rope. Do this on both sides. See Detail B and C.

14’ wide shelter = 12’ between zippers = 5 swedged poles + 1 plain pole
12’ wide shelter = 10’ between zippers = 4 swedged poles + 1 plain pole
10’ wide shelter = 8’ between zippers = 3 swedged poles + 1 plain pole
8’ wide shelter = 6’ between zippers = 2 swedged poles + 1 plain pole
6’ wide shelter = 4’ between zippers = 1 swedged pole + 1 plain pole

 

see detail b

left zipper

cover

approx. 18” 

from zipper

“s” hook

DETAIL C

view Door 

Inside

pipe sections filled with 

sand inside pocket

rope Inside

rope tied 

here outside

rope outside

see detail a

DETAIL A

screw cleat to second  

vertical pipe on either 

side of door.

DETAIL b

pulley

rope

rope

knot

roof 

cover

Cover Inside

Door Outside

cut above 

Webbing

G. Tie each end of rope in a knot in the 

hole, around the webbing rope on both 

sides of the door on the outside cover. 
H. Cut 2 more slits inside the shelter on 

door above the webbing. Hang each  

pulley here. See Detail B.
i. Pass the rope from the knot down 

under the door and back up to the first 

pulley. Hook each rope on each pulley. 

Do this on both sides. See Detail C. 
j. on the opposite side of the cleat, 

bring one rope across top of the door to 

the other pulley and pass it through that 

pulley. you should have 2 pieces of rope 

hanging on the same side of the shelter 

as the cleat. 
K. Hand start to roll up the door hold-

ing the 2 ropes together. The door will 

start to roll up around the pipe from the 

bottom as you pull the ropes, similar to 

a window shade. Secure the ropes to 

cleat at preferred height.

EASY ROLL-UP DOOR kIT

Содержание Round Top

Страница 1: ...l Safety Glasses Rope Tape Measure Ratchet with Socket Set Adjustable Wrench Step Ladder Rubber Mallet Utility Knife 5 8 Concrete Drill Bit Sledge Hammer 05 201133_13 0D 05 201133_13 0D ShelterLogic L...

Страница 2: ...could shed snow ice or excessive run off onto your shelter DO NOT hang objects from the roof or support cables Do not smoke or use open flame devices in or around the shelter DO NOT store flammable l...

Страница 3: ...d instructions completely before assembly Layout out frame parts as shown and match up items with quantity to make sure no parts are missing ShelterLogic LLC 150 Callender Road Watertown CT 06795 www...

Страница 4: ...3 Bolt 2 Bolt 3 Install Side Rails and ShelterLock Stabilizer Blocks A Place assembled first end rib in the staked area Place the ShelterLock on the upright as shown in Detail D From the outside of t...

Страница 5: ...d brace end before pulling the side rail Replace the cross rail and wind brace See Detail J Replace the nut and tighten Repeat this on the other side D At the bottom where the webbing exits the pocket...

Страница 6: ...fit in bottom pocket of door Slide pipes into one another to assemble NOTE If your model included a roll up door kit follow the instructions below Read all instructions before beginning assembly DOOR...

Страница 7: ...u AVERTISSEMENT Avant d installer consulter tous les codes locaux et municipaux concernant l installation d abris temporaires Choisir soigneusement l emplacement de l abri Faire attention aux lignes l...

Страница 8: ...ature de bout Renfort contre vent le nombre de partie de la fabrication le Nombre de r f rence d assembl e 1 2 3 4 5 6 7 8 10224 10225 10226 10273 02030 02031 10110 10111 9 10 11 12 13 14 15 16 10112...

Страница 9: ...s 10210 3 Boulons 2 Boulons 3 Installer les barres transversales et les bloques stabilisateur ShelterLock A Positionner la premi re ossature assembl e dans l emplacement pr vu Placer le Shelterlock en...

Страница 10: ...s des poteaux et s curisez avec la quincaillerie indiqu e dans le d tail G 7 Installation des ancres A Les ancres doivent tre placer l int rieur de l abris Com mencez au coins de l abris Ins rez une b...

Страница 11: ...rture de porte suiver les instructions si des sous S assurer de bien lire les instructions avant de commencer l assemblage LE KIT D OUVERTURE INCLUSE 2 Crochets en S 2 Bouchons pour les tuyaux 1 Croch...

Страница 12: ...o La cubierta puede limpiarse f cilmente con jab n suave y agua ADVERTENCIA Antes de la instalaci n consulte la normativa local y municipal relativa a la instalaci n de cobertizos tempora les Elija la...

Страница 13: ...laje LLAME a nuestro Dpto de Servicio al Cliente 1 800 524 9970 CANADA 1 800 559 6175 atenci n NO DEVUELVA EL PRODUCTO AL DISTRIBUIDOR Para las piezas faltantes el reemplazo o la asistencia con el ens...

Страница 14: ...os bloques estabilizadores ShelterLock A Coloque la cercha terminal que ensambl primero en el rea con estacas Coloque ShelterLock en el paral como se ilustra en la figura detallada D Desde la parte ex...

Страница 15: ...ado del tejido del frente y posterior de la esquina de la unidad Coloque la cubierta de modo que est centrada en la estructura desde el frente hacia atr s Refi rase a la figura detallada K B Doble el...

Страница 16: ...Si su modelo inclu a un kit de puerta enrollable siga estas instrucciones Lea todas las instrucciones antes de comenzar el ensamblaje EL KIT DE PUERTA INCLUYE 2 Ganchos en S 2 Conectores para postes 1...

Отзывы: