Page 10
Page 11
05-201133_13-0D
05-201133_13-0D
10. SECURING YOUR COVER:
A. install the “S”- hook from the ratchet assembly into the legs of
the shelter. Pull the webbing carefully to remove the slack from the
cover. Do not to pull the webbing through the opposite side of the
cover.
B. insert the webbing through the spindle of the ratchet and pull
tight. See Detail o. Wind the ratchet until the webbing overlaps
itself. Repeat these steps on the opposite side, then repeat this
on the back side of the shelter.
C. When all of the corners are secured, adjust the cover front to
back so that it is centered. When the cover is centered, tighten all
of the ratchets. Do this in an “x” pattern to be sure it is tightened
evenly. See Detail o.
D. install the cover rails (10110) by inserting them into the pipe
pockets on each side of the cover. Bolt (10115) the rails to the ribs
using the 3-way and 4-way clamps as shown in Detail P. Check
that the rails are evenly spaced 8” above the ground on both
sides. Push down on the cover rails and connectors, one at a
time, to tighten the bolted clamps and the cover.
IMPORTANT:
Install bolt caps (10150) on exposed bolts on side
rails and wind braces to prevent injury.
DETAIL O
OUTSIDE
CORNER
vIEw
10115
01010
11102
10115
10111
01010
DETAIL P
NOTE: CHECk THAT
YOUR COVER IS
CORRECTLY PLACED
ON THE FRAME.
The ShelterLogic
®
logo should line
up on the left front and right rear
corners near the top rail. If the logo
is not legible and positioned as
shown as “incorrect”, the cover has
not been put on the frame correctly.
CORRECT
INCORRECT
Check and
tighten Ratchets
and Cross Rails
monthly to ensure
the cover is tight.
Cover Tightening Tip
clamps
clamps
CORNER LEG
MIDDLE LEG
WARNING:
Serious injury to persons or property could result if cover is installed and shelter is not
completed and is left unattended. Shelter must be securely anchored until completed.
10110
A. Review all parts included in the kit.
B. Measure width of door between the zippers to determine size.
C. Assemble pipes in combinations below to fit in bottom pocket of door.
Slide pipes into one another to assemble.
NOTE:
If your model included
a roll up door kit, follow the
instructions below. Read all
instructions before beginning
assembly.
DOOR KIT INCLUDES:
2 - “s” hooks
2 - plugs for poles
1 - butterfly cleat
2 - screws for cleat
1 - philips head screwdriver bit
1 - pipe, plain end
5 - pipes, swedged end
1 - 100’ rope
D. fill pipe with sand for added weight and insert plugs. Slide pipe into pocket
at bottom of door.
e. Attach cleat with screws, inside shelter, to second vertical rib, about 8”
down from cross rail on either side. See Detail A.
f. Cut a small slit/hole, approximately 18” in from zipper, on the outside of the
cover, just above the webbing rope. Do this on both sides. See Detail B and C.
14’ wide shelter = 12’ between zippers = 5 swedged poles + 1 plain pole
12’ wide shelter = 10’ between zippers = 4 swedged poles + 1 plain pole
10’ wide shelter = 8’ between zippers = 3 swedged poles + 1 plain pole
8’ wide shelter = 6’ between zippers = 2 swedged poles + 1 plain pole
6’ wide shelter = 4’ between zippers = 1 swedged pole + 1 plain pole
see detail b
left zipper
cover
approx. 18”
from zipper
“s” hook
DETAIL C
view Door
Inside
pipe sections filled with
sand inside pocket
rope Inside
rope tied
here outside
rope outside
see detail a
DETAIL A
screw cleat to second
vertical pipe on either
side of door.
DETAIL b
pulley
rope
rope
knot
roof
cover
Cover Inside
Door Outside
cut above
Webbing
G. Tie each end of rope in a knot in the
hole, around the webbing rope on both
sides of the door on the outside cover.
H. Cut 2 more slits inside the shelter on
door above the webbing. Hang each
pulley here. See Detail B.
i. Pass the rope from the knot down
under the door and back up to the first
pulley. Hook each rope on each pulley.
Do this on both sides. See Detail C.
j. on the opposite side of the cleat,
bring one rope across top of the door to
the other pulley and pass it through that
pulley. you should have 2 pieces of rope
hanging on the same side of the shelter
as the cleat.
K. Hand start to roll up the door hold-
ing the 2 ropes together. The door will
start to roll up around the pipe from the
bottom as you pull the ropes, similar to
a window shade. Secure the ropes to
cleat at preferred height.
EASY ROLL-UP DOOR kIT