background image

INSTALLATIEHANDLEIDING – P15 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P15  | 

P15

06A2NM20ENG05

The Home Basic Edition can be configured locally using 
the rotary switches and dip switches on the chargepoint.

Make sure that the charge point is not yet powered on 
before configuring the features described in this chapter.

6.1 POWER SETTING

Select the maximum allowed current for the installed 
circuit. Take the MCB, RCD, grid connection and local 
regulations into account. Use table 1.1 to determine your 
desired position of the left rotary switch, as indicated in 
the ’3.4.3 Overview Installing Accessories’ section.

Rotary Position Maximum 

allowed current

0

16 A

1

20 A

2

25 A

3

32 A

4

16 A

5

20 A

6

25 A

7

32 A

Table 1.1: Maximum allowed current

6. LOCAL CONFIGURATION

6.2 DYNAMIC POWER MANAGEMENT 

SETTING

Enable Dynamic Power Management if the CT for 7,4 
kW charge point or Dynamic Power Management 
module for 22 kW charge point is installed. Use table 
1.2 to determine your desired position of the right rotary 
switch, as indicated in the ’3.4.3 Overview Installing 
Accessories’ section. Select the maximum allowed 
Dynamic Power Management current for the installed 
circuit. Take the MCB, RCD, grid connection and local 
regulations into account.

Rotary Position Dynamic Power 

Management current

0

Dynamic Power 
Management disabled

1

16 A

2

20 A

3

25 A

4

32 A

5

35 A

6

40 A

7

50 A

8

63 A

9

70 A

A

80 A

B

90 A (7,4 kW model only)

C or greater

100 A (7,4 kW model only)

Table 1.2: Dynamic Power Management current

Содержание NewMotion Home Advanced 2.2

Страница 1: ...100 cm Home Basic Edition 7 Home Basic Edition 22 VERSION 06A2NM20ENG05 2020 INSTRUCTION MANUAL EN...

Страница 2: ......

Страница 3: ...rth terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breake...

Страница 4: ...MANUAL P4 P4 06A2NM20ENG05 This selected charge point is not connected to a back office No online services or remote support are available for this charge point In case of an error or issue on site su...

Страница 5: ...ty cable with 2 x 1 5mm2 minimum For 22 kW Dynamic Power Management functionality UTP cable CAT5 or CAT6 RJ11 UTP cable crimp tool 2x RJ11 RJ12 connectors Cable mount clips Package contents charge poi...

Страница 6: ...529 IP code protection class Certificates User interface Identification start charging Configuration Backoffice protocol Stand by consumption 06A _ _ _ _ _ _ 06B _ _ _ _ _ _ Home Basic Edition 7 singl...

Страница 7: ...lled outdoors with a road proximity less then 5 meters 3 2 TECHNICAL SPECIFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS 22 KW MODEL ONLY Operating temperature range Operating humidit...

Страница 8: ...HANDLEIDING P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 06A2NM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2 EV Plug socket Cover lid Identification label with serial number LED statu...

Страница 9: ...2INT01 INSTRUCTION MANUAL P9 P9 06A2NM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS 7 4 KW VERSION Neutral wire connection Phase wire connection Earth wire connection Power cable Cable clam...

Страница 10: ...2 OVERVIEW OF CONNECTIONS 22 KW VERSION Phase 1 Phase 2 Phase 3 Power cable inlet Cable clamp Earth Earthing pole If connecting to a 3 phase grid without neutral only install 1 phase and connect one...

Страница 11: ...RIES Dynamic Power Management cable or CT cable inlet 7 4 kW model 2x 1 5 mm2 cable 22 kW model CAT5 6 UTP cable 22 kW model RJ12 P1 port for Dynamic Power Management 7 4 kW model CT connection for Dy...

Страница 12: ...kness appropriate for the specific situation and according to regulations 3 phase charge point can also be connected to 1 phase In this case the charge point can only charge on 1 phase The electrician...

Страница 13: ...ed in 3 4 1 Overview of Connections 7 4 kW or 3 4 2 Overview of Connections 22 kW Version 5 4A DYNAMIC POWER MANAGEMENT CT FOR 7 4 KW MODEL The Current Transformer for Dynamic Power Management include...

Страница 14: ...nstalling Accessories section If both ends of the UTP cable are properly connected to the charge point Dynamic Power Management module and powered the P1 LED will indicate whether the connection is co...

Страница 15: ...0 16 A 1 20 A 2 25 A 3 32 A 4 16 A 5 20 A 6 25 A 7 32 A Table 1 1 Maximum allowed current 6 LOCAL CONFIGURATION 6 2 DYNAMIC POWER MANAGEMENT SETTING Enable Dynamic Power Management if the CT for 7 4 k...

Страница 16: ...E POINT If so it means your car won t charge when plugged in To fix this issue turn off the Mechanical Circuit Breaker in the fuse box wait 15 seconds and turn it back on DOES YOUR CAR CHARGE VERY SLO...

Страница 17: ......

Отзывы: