INSTALLATIEHANDLEIDING – P13
VERSION 0129NM02INT01
INSTRUCTION MANUAL – P13 |
P13
06A2NM20ENG05
Thank you for installing this charge point. Make sure
there is enough space to properly do the work.
Ensure to work safely and take the safety of others into
consideration as well, always work according to local
safety regulations. Ask the owner if there is anything
of significant importance that requires electricity in the
house, before you turn of the electricity.
When selecting the mounting location of the charge point,
ensure that future maintenance work can be carried out
safely without obstruction.
5.1 PREPARATION
Step 1: Prepare the cabling & RCD and MCB (conform to
local rules & regulations);
Step 2: Indicate which circuit(s) the charge point is
connected to in the distribution board;
Step 3: Turn the socket lid anti-clockwise and out of the
cover of the charge point;
Step 4: Then pull the cover from the rear edge to open
the charge point. Do not use any objects or tools to do
this.
5.2 MECHANICAL MOUNT
Step 1: Put the charge point back plate on the wall
to check its placement (charge poin is leveled and
connector at +/- 1 m height). On the wall, mark the
positioning of the top two and bottom two attachment
points of the charge point and select the appropriate
fixtures (plugs, screws and washers).
Step 2: Drill all four holes and put the plugs in place.
Step 3: Place the two provided plastic spacers at the
backside of the bottom two attachment points. Secure
the charge point to the wall using the top two and
bottom two attachment points. Ensure that the rubber
and stainless steel washers are used and placed on the
back of the charge point at the bottom two attachment
points.
5.3 POWER CONNECTION
Step 1: Select the appropriate grommet that suits the
cable thickness and place it in the opening of the power
cable inlet. Lubcirate if necessary to make it easier to
feed the power cable through;
Step 2: Secure the power cable using the cable clamp;
Step 3: Connect the power to the terminal blocks, as
indicated in ‘3.4.1 Overview of Connections | 7,4 kW’ or
‘3.4.2 Overview of Connections | 22 kW Version’.
5.4A DYNAMIC POWER MANAGEMENT
- CT FOR 7,4 KW MODEL
The Current Transformer for Dynamic Power
Management (included in box) must be connected to the
phase used by the charge point at the most upstream
point of the house grid, closest to the house grid
connection.
Step 1: Install the CT on the same phase used by the
charge point, measuring the whole household. Place the
terminal block on a DIN-rail in the fusebox;
Step 2: Place a standard cable of 2x 1,5mm
2
(not
supplied) and connect two wires on both terminal blocks
in the charge point as indicated in the ’3.4.3 Overview
Installing Accessories’ section. Then place the cable of
2x 1,5mm
2
to the CT on the side of the grid connection.
The maximum length of the cable is 100m.
5.4B DYNAMIC POWER MANAGEMENT
MODULE FOR 22 KW MODEL
The Dynamic Power Management Module package
contains one Dynamic Power Management module, one
power adapter and three current transformers (CT’s).
The CT’s must be connected at the most upstream point
of the house grid, closest to the grid connection. Arrows
are shown on the CT, but direction is not important.
The connections for the CT’s are located at the bottom
of the Dynamic Power Management module, and are
labelled with L1, L2 and L3 on the front label. L1, L2 and
L3 must be connected to the first, second and third
phase of the house grid in the correct order.
Although each measuring head is provided with two
different coloured threads, the polarity of connection is
not important.
The power cable connection on the terminal block of
the charge point should match the L1, L2 and L3 in the
charge point.
For a 1 phase installed charge point the L1 measurement
head should match the conduction which is connected
to the L1 of the terminal block.
Installation procedure
Step 1: Install the Dynamic Power Management module
on the DIN Rail in the fuse box;
Step 2: Connect the CT(’s) to the Dynamic Power
Management module, as described in the beginning of
this paragraph;
Step 3: Apply the CT(’s) to the grid connection(s). Make
sure to apply the CT(’s) so that the total power usage of
the household is measured on each phase;
5. INSTALLATION PROCEDURE
Содержание NewMotion Home Advanced 2.2
Страница 1: ...100 cm Home Basic Edition 7 Home Basic Edition 22 VERSION 06A2NM20ENG05 2020 INSTRUCTION MANUAL EN...
Страница 2: ......