Thank you for installing this charge point. Make sure 
there is enough space to properly do the work. 
Ensure to work safely and take the safety of others into 
consideration as well, always work according to local 
safety regulations. Ask the owner if there is anything 
of significant importance that requires electricity in the 
house, before you turn of the electricity.
When selecting the mounting location of the charge point, 
ensure that future maintenance work can be carried out 
safely without obstruction.

5.1 PREPARATION

Step 1: Prepare the cabling & RCD and MCB (conform to 
local rules & regulations); 
Step 2: Indicate which circuit(s) the charge point is 
connected to in the distribution board;  
Step 3: Turn the socket lid anti-clockwise and out of the 
cover of the charge point; 
Step 4: Then pull the cover from the rear edge to open 
the charge point. Do not use any objects or tools to do 
this.

5.2 MECHANICAL MOUNT 

Step 1: Put the charge point back plate on the wall 
to check its placement (charge poin is leveled and 
connector at +/- 1 m height). On the wall, mark the 
positioning of the top two and bottom two attachment 
points of the charge point and select the appropriate 
fixtures (plugs, screws and washers). 
Step 2: Drill all four holes and put the plugs in place. 
Step 3: Place the two provided plastic spacers at the 
backside of the bottom two attachment points. Secure 
the charge point to the wall using the top two and 
bottom two attachment points. Ensure that the rubber 
and stainless steel washers are used and placed on the 
back of the charge point at the bottom two attachment 
points.

5.3 POWER CONNECTION

 

Step 1: Select the appropriate grommet that suits the 
cable thickness and place it in the opening of the power 
cable inlet. Lubcirate if necessary to make it easier to 
feed the power cable through; 
Step 2: Secure the power cable using the cable clamp; 
Step 3: Connect the power to the terminal blocks, as 
indicated in ‘3.4.1 Overview of Connections | 7,4 kW’ or 
‘3.4.2 Overview of Connections | 22 kW Version’.

5.4A DYNAMIC POWER MANAGEMENT 

- CT FOR 7,4 KW MODEL

The Current Transformer for Dynamic Power 
Management (included in box) must be connected to the 
phase used by the charge point at the most upstream 
point of the house grid, closest to the house grid 
connection.
Step 1: Install the CT on the same phase used by the 
charge point, measuring the whole household. Place the 
terminal block on a DIN-rail in the fusebox;
Step 2: Place a standard cable of 2x 1,5mm

2

 (not 

supplied) and connect two wires on both terminal blocks 
in the charge point as indicated in the ’3.4.3 Overview 
Installing Accessories’ section. Then place the cable of 
2x 1,5mm

2

 to the CT on the side of the grid connection. 

The maximum length of the cable is 100m.

5.4B DYNAMIC POWER MANAGEMENT 

MODULE FOR 22 KW MODEL 

 

The Dynamic Power Management Module package 
contains one Dynamic Power Management module, one 
power adapter and three current transformers (CT’s). 
The CT’s must be connected at the most upstream point 
of the house grid, closest to the grid connection. Arrows 
are shown on the CT, but direction is not important.
The connections for the CT’s are located at the bottom 
of the Dynamic Power Management module, and are 
labelled with L1, L2 and L3 on the front label. L1, L2 and 
L3 must be connected to the first, second and third 
phase of the house grid in the correct order.
Although each measuring head is provided with two 
different coloured threads, the polarity of connection is 
not important.
The power cable connection on the terminal block of 
the charge point should match the L1, L2 and L3 in the 
charge point. 
For a 1 phase installed charge point the L1 measurement 
head should match the conduction which is connected 
to the L1 of the terminal block.

Installation procedure

Step 1: Install the Dynamic Power Management module 
on the DIN Rail in the fuse box;
Step 2: Connect the CT(’s) to the Dynamic Power 
Management module, as described in the beginning of 
this paragraph;
Step 3: Apply the CT(’s) to the grid connection(s). Make 
sure to apply the CT(’s) so that the total power usage of 
the household is measured on each phase;

5. INSTALLATION PROCEDURE

Содержание NewMotion Home Advanced 2.2

Страница 1: ...100 cm Home Basic Edition 7 Home Basic Edition 22 VERSION 06A2NM20ENG05 2020 INSTRUCTION MANUAL EN...

Страница 2: ......

Страница 3: ...rth terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breake...

Страница 4: ...MANUAL P4 P4 06A2NM20ENG05 This selected charge point is not connected to a back office No online services or remote support are available for this charge point In case of an error or issue on site su...

Страница 5: ...ty cable with 2 x 1 5mm2 minimum For 22 kW Dynamic Power Management functionality UTP cable CAT5 or CAT6 RJ11 UTP cable crimp tool 2x RJ11 RJ12 connectors Cable mount clips Package contents charge poi...

Страница 6: ...529 IP code protection class Certificates User interface Identification start charging Configuration Backoffice protocol Stand by consumption 06A _ _ _ _ _ _ 06B _ _ _ _ _ _ Home Basic Edition 7 singl...

Страница 7: ...lled outdoors with a road proximity less then 5 meters 3 2 TECHNICAL SPECIFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS 22 KW MODEL ONLY Operating temperature range Operating humidit...

Страница 8: ...HANDLEIDING P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 06A2NM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2 EV Plug socket Cover lid Identification label with serial number LED statu...

Страница 9: ...2INT01 INSTRUCTION MANUAL P9 P9 06A2NM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS 7 4 KW VERSION Neutral wire connection Phase wire connection Earth wire connection Power cable Cable clam...

Страница 10: ...2 OVERVIEW OF CONNECTIONS 22 KW VERSION Phase 1 Phase 2 Phase 3 Power cable inlet Cable clamp Earth Earthing pole If connecting to a 3 phase grid without neutral only install 1 phase and connect one...

Страница 11: ...RIES Dynamic Power Management cable or CT cable inlet 7 4 kW model 2x 1 5 mm2 cable 22 kW model CAT5 6 UTP cable 22 kW model RJ12 P1 port for Dynamic Power Management 7 4 kW model CT connection for Dy...

Страница 12: ...kness appropriate for the specific situation and according to regulations 3 phase charge point can also be connected to 1 phase In this case the charge point can only charge on 1 phase The electrician...

Страница 13: ...ed in 3 4 1 Overview of Connections 7 4 kW or 3 4 2 Overview of Connections 22 kW Version 5 4A DYNAMIC POWER MANAGEMENT CT FOR 7 4 KW MODEL The Current Transformer for Dynamic Power Management include...

Страница 14: ...nstalling Accessories section If both ends of the UTP cable are properly connected to the charge point Dynamic Power Management module and powered the P1 LED will indicate whether the connection is co...

Страница 15: ...0 16 A 1 20 A 2 25 A 3 32 A 4 16 A 5 20 A 6 25 A 7 32 A Table 1 1 Maximum allowed current 6 LOCAL CONFIGURATION 6 2 DYNAMIC POWER MANAGEMENT SETTING Enable Dynamic Power Management if the CT for 7 4 k...

Страница 16: ...E POINT If so it means your car won t charge when plugged in To fix this issue turn off the Mechanical Circuit Breaker in the fuse box wait 15 seconds and turn it back on DOES YOUR CAR CHARGE VERY SLO...

Страница 17: ......

Отзывы: