INSTALLATIEHANDLEIDING – P10
VERSION 0129NM02INT01
INSTRUCTION MANUAL – P10 |
P10
06A2NM20ENG05
Tension relief
data cable
3. PRODUCT OVERVIEW
3.4.2 OVERVIEW OF CONNECTIONS | 22 KW VERSION
Phase 1
Phase 2
Phase 3
Power cable inlet
Cable clamp
Earth
Earthing
pole
If connecting to a 3-phase grid without neutral; only install 1-phase and connect one of the two other phase
wires in the neutral wire connection on the terminal block.
Neutral
Earthing pole
connection
Power cable connections
Содержание NewMotion Home Advanced 2.2
Страница 1: ...100 cm Home Basic Edition 7 Home Basic Edition 22 VERSION 06A2NM20ENG05 2020 INSTRUCTION MANUAL EN...
Страница 2: ......
Страница 17: ......