2
GETTING STARTED
INSTALLATION REQUIREMENTS
To ensure safety and proper machine performance, please note the
following before initial installation and whenever the machine is to be
relocated.
1.
The copier should be installed near an accessible power outlet
for easy connection.
2.
Be sure to connect the power cord only to a power outlet that
meets the specified voltage and current requirements.
Also make certain the outlet is properly grounded.
3.
Do not install the machine where it is:
●
damp or humid,
●
exposed to direct sunlight,
●
extremely dusty,
●
poorly ventilated,
●
subject to extreme temperature or humidity changes (e.g., near
an air conditioner or heater).
4.
Ensure that the area chosen for the machine location is level.
5.
Be sure to allow the required space around the machine for
servicing and proper ventilation.
A small amount of ozone is produced within the copier during operation.
The emission level is insufficient to cause any health hazard.
NOTE:
The present recommended long term exposure limit for ozone is 0.1 ppm
(0.2 m
g
/m
3
) calculated as an 8 hr. time-weighted average concentration.
However, since the small amount that is emitted may have an objectionable
odor, it is advisable to place the copier in a ventilated area.
Installation requirements
11-13/16"
(30 cm)
23-5/8"
(60 cm)
23-5/8"
(60 cm)
11-13/16"
(30 cm)
Содержание SF-2530
Страница 88: ...86 OPTIONAL EQUIPMENT MEMO ...
Страница 90: ...99C DSC3 CINSE1807FC51 ...