OPERATOR’S MANUAL
P 57 / 57
12. Remarks
1
、
All LONG CHANG products, from parts to finished machines, have gone through different
flows of process under strict QC systems, with precision degrees in conformity with CNS
(please vide charts of ex-factory inspection). TO ensure the preciseness, service life and
safety operations, it is highly advisable for the users to study the full details in this manual.
2
、
Suggestions for improvements of the machine structure and/or inquiries, including plant
visitations, are cordially welcome.
3
、
In case of maintenance, servicing and parts changes, please contact our sales agencies or
business department directly.
4
、
The manufacturer reserves the right to modify the design, operations, structure etc all of the
machine without any prior notice.
Содержание LC-20VA
Страница 1: ...OPERATOR S MANUAL SHARP INDUSTRIES INC 310 370 5990 edition A02 LC 20VSG VH 25 Series ...
Страница 14: ...OPERATOR S MANUAL P 11 57 A C B C E G D F H FIG 9 2 Replacement of speed change belt R Fig 10 ...
Страница 16: ... OPERATOR S MANUAL P 13 57 P N O J L K M I Q FIG 10 3 Replacement of brake block Fig 11 12 ...
Страница 18: ...OPERATOR S MANUAL P 15 57 B EADSTOCK 20VB 20VC a Names of Machine Parts 1 20 VB Headstock FIG 13 ...
Страница 19: ...OPERATOR S MANUAL P 16 57 2 20 VC Headstock FIG 14 ...
Страница 29: ...OPERATOR S MANUAL P 26 57 6 Machine Body A Names Of Machine Parts a Machine Body Turret Ram And Bracket ...
Страница 30: ...OPERATOR S MANUAL P 27 57 ...
Страница 46: ...OPERATOR S MANUAL P 43 57 ...
Страница 58: ...OPERATOR S MANUAL P 55 57 SPEED DIAGRAM Motor 50 Hz ...