OPERATOR’S MANUAL
P 48 / 57
NO. INSPECTION
ITEMS
ILLUSTRATUION
TOLERANCE
mm
Measured
mm
12
OVERARM SLIDE
PARALLELISM OF CROSS
MOVEMENT WITH TABLE
TOP
0.02
13
HORIZONTAL SPINDLE
FACE RUN OUT
0.01
14
HORIZONTAL SPINDLE
FACE TRUE
0.015
15
HORIZONTAL SPINDLE
HOLE RUN OUT
AT FACE OF SPINDLE
AT END OF 300mm TEST
BAR
0.01
0.02
16
PARALLELISM OF TABLE
TOP WITH HORIZONTAL
SPINDLE
(HIGH AT FRONT OF
TABLE)
0.01
0.02
17
TABLE TOP PARALLELISM
OF CROSS MOVEMENT
WITH HORIZONTAL
SPINDLE
IN VERTICAL IN
HORIZONTAL
0.02/300
0.02/300
Содержание LC-20VA
Страница 1: ...OPERATOR S MANUAL SHARP INDUSTRIES INC 310 370 5990 edition A02 LC 20VSG VH 25 Series ...
Страница 14: ...OPERATOR S MANUAL P 11 57 A C B C E G D F H FIG 9 2 Replacement of speed change belt R Fig 10 ...
Страница 16: ... OPERATOR S MANUAL P 13 57 P N O J L K M I Q FIG 10 3 Replacement of brake block Fig 11 12 ...
Страница 18: ...OPERATOR S MANUAL P 15 57 B EADSTOCK 20VB 20VC a Names of Machine Parts 1 20 VB Headstock FIG 13 ...
Страница 19: ...OPERATOR S MANUAL P 16 57 2 20 VC Headstock FIG 14 ...
Страница 29: ...OPERATOR S MANUAL P 26 57 6 Machine Body A Names Of Machine Parts a Machine Body Turret Ram And Bracket ...
Страница 30: ...OPERATOR S MANUAL P 27 57 ...
Страница 46: ...OPERATOR S MANUAL P 43 57 ...
Страница 58: ...OPERATOR S MANUAL P 55 57 SPEED DIAGRAM Motor 50 Hz ...