OPERATOR’S MANUAL
P 42 / 57
7. Transport, Unpacking and Floor
Space
A
、
Methods of Transport:
1
、
Methods of Transport:
a. Prior of packed trnsport may be made by using forklift ( Figure 50 ) and a reinforced cable
( Figure 52 ).
b. After unpacking, transport may be made by hoisting with a reinforced cable ( Figure 51 ) and
the forklift eye bolt ( Figure 53 ).
Remarks:
1. When the machine is being hoisted, keep the personnel afar.
2. Hsisting by eye bolt should be used as less as possible.
3. To hoist the unpacked case by reinforced cable, the motion shall observe strictly the
instructions appeared on side of the wooden case.
4. Keep the work table and saddle in the proper positions so as to keep the machine balance.
5. Do not hoist the machine too high. The best position is to keep the machine base
approximately 10 cm from the ground.
6. Do not allow the machine to wobble in hoisting.
7. Only an authorized forklift or crane operator is allowed to transport the machine.
Содержание LC-20VA
Страница 1: ...OPERATOR S MANUAL SHARP INDUSTRIES INC 310 370 5990 edition A02 LC 20VSG VH 25 Series ...
Страница 14: ...OPERATOR S MANUAL P 11 57 A C B C E G D F H FIG 9 2 Replacement of speed change belt R Fig 10 ...
Страница 16: ... OPERATOR S MANUAL P 13 57 P N O J L K M I Q FIG 10 3 Replacement of brake block Fig 11 12 ...
Страница 18: ...OPERATOR S MANUAL P 15 57 B EADSTOCK 20VB 20VC a Names of Machine Parts 1 20 VB Headstock FIG 13 ...
Страница 19: ...OPERATOR S MANUAL P 16 57 2 20 VC Headstock FIG 14 ...
Страница 29: ...OPERATOR S MANUAL P 26 57 6 Machine Body A Names Of Machine Parts a Machine Body Turret Ram And Bracket ...
Страница 30: ...OPERATOR S MANUAL P 27 57 ...
Страница 46: ...OPERATOR S MANUAL P 43 57 ...
Страница 58: ...OPERATOR S MANUAL P 55 57 SPEED DIAGRAM Motor 50 Hz ...