4) Remove the two screws (7) of the guide bar holder (6).
5) Remove the four screws (9) and remove the bin lower unit (8).
When removing, separate the guide bar holder from the guide bar.
6) Remove the bin roller stopper and the bin roller, and remove the
bin.
Note: When assembling the bins, check the bin roller stopper lock
section. If it is broken, replace it. After assembling the bin unit,
check that all bin roller stoppers are in position.
C. Bin shift motor (M1) removal
1) Remove the rear cover.
2) Remove the screw (2) of the transport motor clock sensor mount-
ing plate, and then remove the transport motor clock sensor
mounting plate (1).
3) Remove the connector (3), and pull out the tie lap(4) from the hole
in the plate.
4) Remove the two screws (5), and remove the bin shift motor.
D. Lead cam
1. Lead cam removal
1) Turn on the power of the copier. Press SW2 on the sorter control-
ler PWB to move the bin unit to the bottom.
Note: If two lead cams on the front and the rear sides are pressed
simultaneously, the bin unit falls suddenly. To prevent against
this, be sure to press them one at a time.
2) Remove the E-ring (1), the sensor flag (2), and the gear (3).
3) Remove the three screws (4), and remove the lead cam unit (5).
2. Lead cam position adjustment
1) Remove the E-ring (2) of the lead cam drive gear (1) on the front
side.
6
7
8
9
9
1
2
3
4
5
5
1
2
3
4
4
5
1
2
AR-SS2
4 – 3
Содержание AR-SS2
Страница 38: ...AR SS2 ...
Страница 39: ... 10 ACTUAL WIRING JOG MOTOR BIN SHIFT MOTOR FEED MOTOR SWING MOTOR SAFTY SW 10 1 10 2 AR SS2 ...
Страница 40: ...AR SS2 ...