5.5 Precautions when installing the stand (strength of anchor)
The strength required when fixing the anchor is as follows.
Calculation condition
Anchor bolt pull-out force
R
1836N
Horizontal seismic intensity for design
Kh
1 G
Vertical seismic intensity for design
Kv
0.5 G
Horizontal seismic force for design
Fh
2018.8 N
Vertical seismic force for design
Fv
1009.4 N
Calculation results
{Fh
Hg-(g
W-Fv)
Lg }/{L
Nt}
Anchor bolt shear force
Q
504.7N
Fh/n
It is assumed that the above force is applied to the anchor
bolt. Please select and install bolts in consideration of the
safety factor.
※
The calculated value is for reference only.
Anchor fixed image diagram
About58
cm
A
bo
ut120
cm
L
Hg
Position of
the center
of gravity
Anchor fixing position
Assuming 4 anchors
Equipment mass
W
206 kg
Anchor bolt
Total number
4 pcs
Total number of pulling side of fall
Nt
2 pcs
Height to the center of gravity of the device
Hg
120 cm
Bolt span seen from the direction of
consideration
L
58 cm
Distance from the center of the bolt to the
center of gravity of the device
Lg
29 cm
Содержание 8M-B120
Страница 3: ...3 3 Copyright All rights reserved SHARP CORPORATION Confidential 1 Overall precautions ...
Страница 8: ...8 8 Copyright All rights reserved SHARP CORPORATION Confidential 2 Design considerations ...
Страница 22: ...22 22 Copyright All rights reserved SHARP CORPORATION Confidential 3 Precautions for transportation ...
Страница 26: ...26 26 Copyright All rights reserved SHARP CORPORATION Confidential 4 Precautions for unpacking ...
Страница 30: ...30 30 Copyright All rights reserved SHARP CORPORATION Confidential 5 Precautions for Installation ...
Страница 50: ...50 50 Copyright All rights reserved SHARP CORPORATION Confidential 6 Options and recommended equipment ...
Страница 52: ...52 ...