33
33
Copyright © All rights reserved, SHARP CORPORATION
Confidential
Installation of stand
Wall hanging and H steel installation
When installing the stand, you can perform maintenance such as board replacement and inspection.
Therefore, it is recommended to secure a space for maintenance in advance when installing.
If maintenance space cannot be secured, additional charges may be incurred for each maintenance.
After installing wall-mounted or H-steel, it is not possible to perform maintenance such as board replacement and inspection
while installed.
When performing maintenance, it is necessary to remove the display from the wall or H steel and perform maintenance with
the stand attached.
Therefore, we recommend that you have a space for maintenance that can be installed in front of the display and a space for
maintenance on the back.
If you cannot secure the maintenance space, you may be charged an additional cost for each maintenance.
* About 700 mm working space is required on the back of the display.
* A space is required in front of the display to install the stand.
Also, a working space of about 700 mm is required on the back.
5.2. Maintenance space for installation
Содержание 8M-B120
Страница 3: ...3 3 Copyright All rights reserved SHARP CORPORATION Confidential 1 Overall precautions ...
Страница 8: ...8 8 Copyright All rights reserved SHARP CORPORATION Confidential 2 Design considerations ...
Страница 22: ...22 22 Copyright All rights reserved SHARP CORPORATION Confidential 3 Precautions for transportation ...
Страница 26: ...26 26 Copyright All rights reserved SHARP CORPORATION Confidential 4 Precautions for unpacking ...
Страница 30: ...30 30 Copyright All rights reserved SHARP CORPORATION Confidential 5 Precautions for Installation ...
Страница 50: ...50 50 Copyright All rights reserved SHARP CORPORATION Confidential 6 Options and recommended equipment ...
Страница 52: ...52 ...