
Doc
#
E145701
D - 9
D: DNP 3.0 Protocol Assignments
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Phase-to-Neutral Voltage (Points 1 - 3)
These points are formatted as 2's complement fractions. They represent a fraction of
a 150V Secondary input. Inputs of above 150V Secondary are pinned at 150V
Secondary.
Phase-to-Phase Voltage (Points 4 - 6)
These points are formatted as 2's complement fractions. They represent a fraction of
a 300V Secondary input. Inputs of above 30 V Secondary are pinned at 300V
Secondary.
Phase Current (Points 7 - 9)
These points are formatted as 2's complement fractions. They represent a fraction of
a 10A Secondary input. Inputs of above 10A Secondary are pinned at 10A Secondary.
Total Power (Points 10 - 11)
Point
Reading
1
Phase AN Voltage
2
Phase BN Voltage
3
Phase CN Voltage
Point
Reading
4
Phase AB Voltage
5
Phase BC Voltage
6
Phase CA Voltage
Point
Reading
7
Phase A Current
8
Phase B Current
9
Phase C Current
Point
Reading
10
Total Watt
11
Total VAR
Содержание 100
Страница 2: ...This page intentionally left blank ...