
Doc
#
E145701
TOC - 4
Table of Contents
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
6.2.5.3: Configuring PT Setting
6-11
6.2.5.4: Configuring Connection Setting
6-13
6.2.5.5: Configuring Communication Port Setting
6-13
6.2.6: Using Operating Mode
6-15
6.3: Understanding the % of Load Bar
6-16
6.4: Performing Watt-Hour Accuracy Testing (Verification)
6-17
6.5: Programming the Transducer or Meter Using Software
6-19
6.5.1: Accessing the Transducer/Meter in Default
Communication Mode (RS485 Communication)
6-19
6.5.2: Connecting to the Transducer/Meter through
Communicator EXT
TM
Software
6-20
6.5.3: Device Profile Settings
6-24
7: Using the Shark® 100B Meter
7-1
7.1: Introduction
7-1
7.1.1: About BACnet
7-1
7.2: Shark® 100B meter’s BACnet Objects
7-2
7.3: Configuring the Shark® 100B Meter
7-5
7.4: Using the Shark® 100B Meter’s Web Interface
7-12
7.5: Using the Shark® 100B in a BACnet Application
7-18
A: Shark® 100/50 Meter Navigation Maps
A-1
A.1: Introduction
A-1
A.2: Navigation Maps (Sheets 1 to 4)
A-1
B: Shark® 100 and 50 Meter Modbus Map
B-1
B.1: Introduction
B-1
Содержание 100
Страница 2: ...This page intentionally left blank ...