![Servomex DF-310E Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/servomex/df-310e/df-310e_operators-manual_1247052020.webp)
16 DF-310E
Installation and Setup
4.3 Electrical Power Connections
4.3.1 AC Input Voltage (100-240 VAC)
Make sure the power switch is in the OFF position. Plug the supplied power
cord into the connector on the rear of the analyzer. See Figure 6. The power
supply is auto-switching which means it will run properly on an input voltage
between 100 VAC and 240 VAC.
4.3.2 DC Input Voltage (24 VDC)
Make sure the power switch is in the OFF position. Using 20 gauge wire,
attach the power supply leads to the power connector J3 on the rear of the
instrument. Pin 1 (top) is positive (+24V) and Pin 3 is negative (24V RTN).
See Figure 4 below.
FLOW-B
UNUSED
FLOW-A
UNUSED
PUMP +
PUMP -
A OUT -
A OUT +
GND
UNUSED
UNUSED
UNUSED
UNUSED
24V RTN
UNUSED
+24V
J3
J4
Figure 4: DC Power Connector – J3
4.4 Power Control
AC Powered Units - Open the front door, locate the power switch and turn it
on. See Figure 2.
DC Powered Units - Turn on the remote 24 VDC power source, open the front
door, locate the power switch and turn it on. See Figure 2.
Содержание DF-310E
Страница 1: ...Oxygen Analyzer DF 310E OPERATOR MANUAL...
Страница 10: ......
Страница 26: ...22 DF 310E Options Figure 7 Plumbing Configuration Options...
Страница 36: ......
Страница 62: ......
Страница 66: ...62 DF 310E User Interface 3 43 ppm...
Страница 96: ......
Страница 108: ......
Страница 118: ......
Страница 122: ......
Страница 124: ......
Страница 129: ......