Analyzer Start-Up Procedure DF-150E
11
5 Analyzer Start-Up Procedure
Your analyzer has been thoroughly tested and calibrated however, it is
necessary to make proper gas connections and to “charge” the sensor prior to
turning the analyzer on.
Analyzer start-up requires the following procedures:
A. Charging the Sensor
B. Making Sample Gas Connections
C. Making Output Signal Connections
D. Powering up the Analyzer
CAUTION
To avoid damage to your analyzer:
Do not operate without electrolyte
Do not use more than one bottle of
E
-Lectrolyte Blue
Do not operate without gas flow
Do not operate a trace level analyzer for more than a few
minutes while exposed to air.
Do not exceed the pressure and flow limits
The electrolyte is a caustic solution. Review the Material
Safety Data Sheet (MSDS) on page 71 before handling the
electrolyte solution.
Содержание DF-130E
Страница 1: ...Oxygen Analyzer DF 150E OPERATOR MANUAL...
Страница 10: ......
Страница 13: ...Specifications DF 150E 9 Figure 1 DF Series Oxygen Analyzer...
Страница 14: ......
Страница 44: ......
Страница 56: ......
Страница 84: ......
Страница 87: ...Index DF 150E 83 U Upsets Oxygen Shock 44 V Voltage 15 46 checking 15 W Warranty 79...