8
LTRS Series
Serene Heated Ladder Towel Rail - Square Profile
Concealed Supply Cord
The supply cord can be concealed inside the bottom mounting
leg of the Towel Rail and wired directly into the wall.
Before installing the Towel Rail with the concealed Supply Cord:
1. Remove the Cable Mounting Bracket from the Towel Rail by
undoing the side Leg Fixing Screw.
2. Cut the plug off the end of the Supply Cord.
3. Slide the Supply Cord Grommet out of the slot in the bottom
mounting leg and remove the grommet from Supply Cord.
4. Feed the Supply Cord through the centre of the Cable
Mounting Bracket (see Figure 4 above).
5. Rotate the Cable Mounting Bracket so the slot underneath
the mounting leg is blanked off.
6. Screw the Cable Mounting Bracket to the mounting leg with
the side Leg Fixing Screw.
To install the Towel Rail on the wall, follow the instructions on the
following page.
Figure 4: Concealed Supply Cord Installation
Cable Mounting Bracket
Supply Cord
Mounting Leg
Towel Rail
Frame
Leg Fixing Screw
Mounting Base Extension