TubTop FS™
Sequoia Spa Shelters
Sky
lig
h
t
Fasten the attachment frame to the top of the roof pan-
els using 2 ½ inch wood screws. The frame is positioned
so that it is even with the edge of the roof frame and so
there is a 1 ¼ inch space on the right side for adjacent
frame.
Continue until all four attachment frames are in place.
2 ½” screws
Lapping frame
Place the skylight over the top of the opening and set
down onto the attachment frame. The skylight also sets
over the flashings of the roof panels. This may require
adjusting the flashing to fit under the skylight.
Photo above shows the skylight in place.
Center the skylight to the opening from the inside of the
building. The inside ledge of the skylight frame aligns to
the inside surface of the attachment frame.
The skylight is held in place using two wooden “L” mold-
ings. Fasten the molding to the attachment frame using
#6 x 1¼ inch wood screws.
Align bottom edge