background image

 
 

EV Charging Station Installation Guide

 

 

2                                                                             

 

     Rev.201901 

 

 

This  guide  assumes  that  the  appropriate  wiring,  conduit  and  circuit  protection  is  in  place  at  the 
installation site. Review this entire document to understand the installation process before installing 
the SemaConnect

TM

 Charging Station. 

Key Requirements 

 

Each EV charging station shall be on a 

dedicated electrical circuit.

 

 

Each  station  shall  be  protected  with  a 

40  Amp  2-pole  common  trip  circuit  breaker  (non-

GFCI type).

 

 

 

Each station is designed to draw a 

maximum of 30Amps.  

 

Each station can operate on either a 

240V or 208V circuit.

 

 

Each station requires 

three electrical supply wires

 (two hot, one ground, no neutral). 

 

All  data  communication  is  wireless,  so  there  is 

no  data  cabling

  to  install,  but  cellular 

communication is required. 

Wiring Diagram 

Connect SemaConnect

TM

 stations to any one of the power source as shown 

 

208 VAC three phase , Delta system, Center tap grounded 

(use only two phases)

 

 

208 VAC three phase, Wye system 

(use only two phases)

 

 

240 VAC single phase 

 

In a delta system, connect the SemaConnect

TM

 station only to a center-tapped grounded transformer 

only as shown below. Connect the station to the side where ground is bonded (in figure C line A and 

C).  This  allows  voltages  to  remain  constant  regardless  of  other  loads  that  may  be  using  the  lines. 

Please do not connect to other type of power sources shown below. 

Содержание 6 Series

Страница 1: ...n Guide Contents Page 1 Safety and Compliance Page 3 Single Dual Pedestal Mount Installation Page 6 Pedestal Mount Installation cont Page 10 Wall Pole Mount Installation SemaConnect Inc 4961 Telsa Drive Suite A Bowie MD 20715 800 663 5633 www semaconnect com ...

Страница 2: ...dures provided in this document SemaConnect is not responsible for damages that may occur during or as a result of installation IN NO EVENT SHALL SEMACONNECT INC OR ITS AUTHORIZED DISTRIBUTORS BE LIABLE FOR ANY INDIRECT INCIDENTAL SPECIAL PUNITIVE OR CONSEQUENTIAL DAMAGES INCLUDING WITHOUT LIMITATION LOST PROFITS LOST DATA LOSS OF USE COST OF COVER OR LOSS OR DAMAGE TO THE SEMACONNECT CHARGING STA...

Страница 3: ...tation requires three electrical supply wires two hot one ground no neutral All data communication is wireless so there is no data cabling to install but cellular communication is required Wiring Diagram Connect SemaConnectTM stations to any one of the power source as shown 208 VAC three phase Delta system Center tap grounded use only two phases 208 VAC three phase Wye system use only two phases 2...

Страница 4: ...hor plate J bolt 3 8 inch wrench Driver Set For Pedestal levelling key size 3 metric Allen Pedestal Mounting key size 10 metric head unit mounting screw Key size 3 metric cable rack Key size 2 metric access panel Key size 2 5 metric Sl no Description Image Quantity Single Pedestal Dual Pedestal 1 Head Unit with J1772 Cable 20ft 1 2 2 Single Pedestal 1 0 3 Dual Pedestal 0 1 OR ...

Страница 5: ... Screws M5x10 Socket Flat head 4 8 5 Pedestal Mounting Screw M12x25 Socket head 4 4 6 Cable hanger 1 2 7 Anchor plate 1 1 8 Sacrificial Bolt M12x25 4 4 9 Sacrificial Bolt M6x30 2 2 10 Anchor J bolt set 3 8 three nuts one flat washer two spring washer 1 J bolt 4 4 ...

Страница 6: ...EV Charging Station Installation Guide 5 SemaConnect 620 Single and Dual Pedestal mount Installation Key Dimensions SemaConnect 520 Single and Dual Pedestal mount Installation Key Dimensions ...

Страница 7: ...turned off Step 2 Prepare the site and construct a concrete form typical footprint 24 x24 Run the electrical conduit through the form Please make sure that the electrical conduit does not come in the way of J bolts while installing anchor plate Step 3 Place concrete into the form and smooth it out Figure 1 Step 4 Attach all four anchor bolts J bolts and four sacrificial Bolt to the anchor plate Fi...

Страница 8: ...igure 3 Step 6 Smooth out the concrete around the anchor plate Note Continuously check for the anchor plate until concrete sets to make sure that anchor plate does not sink into the concrete Figure 3 SemaConnect Single Dual Pedestal Installtion Procedure Step 7 Once the concrete has set remove the Sacrificial bolts Figure 4 from the anchor plate Then place the pedestal on top of anchor plate and s...

Страница 9: ...20 520 onto Pedestal Figure 7 Figure 8 Figure 9 Step 12 Now Slide the head unit onto pedestal and attach it with four mounting screw Figure 8 Note Make sure that the wires are not pinched between pedestal and charging station Step 13 Connect three electrical supply wires Note Strictly adhere to the wire color codes to ensure proper installation Green Green And use wirenut and Insulation tape for s...

Страница 10: ...e station SemaConnect Wall Pole Mount Installation Tools Required Electrical Tools Wire stipper Wire nut Insulation tape Mechanical Tools Power drill leveller Allen key set head unit mounting screw Key size 3 cable rack Key size 2 access panel Key size 2 5 Wall mount bolt and Pole mount Strap not supplied Quantity Sl no Description Image Wall mount Pole Mount 1 Head Unit 1 1 2 Wall Pole Mount 1 1 ...

Страница 11: ...EV Charging Station Installation Guide 10 4 Head Unit Mounting Screws M5x10 Socket Flat head 4 4 6 Cable hanger 1 1 SemaConnect 620 520 Wall Mount Installation Key Dimensions ...

Страница 12: ...l Mount Attach Wall Mount Bracket to wall with 4 bolts b If Pole Mount Attach Pole Mount Bracket with three straps In both cases electrical conduit can run from the back or the side Also make sure that the wall mount is level Preparing the SemaConnectTM 620 520 head Unit Step 3 Loosen the Set screws in the head unit and attach Cable rack to charging Station Figure 1 Step 4 Remove the access panel ...

Страница 13: ... codes to ensure proper installation Green Green And use wirenut and Insulation tape for safety Step 8 Carefully push the wire in and attach the access plate Figure 3 Step 9 Power up Charging Station by turning on circuit breaker s Station will automatically communicate with network and initialize itself using cellular signal Successful power up is Step 10 Call 800 663 5633 to complete Installatio...