
SmartBox® 1 / SmartBox® 2 / SmartBox® 3
2 / 16
Part no. 28 100 57 d
Pos : 14 /Anleitungen
A5/STANDARDMO DULE /Übers c hriften/Allgemeines @ 1\
mod_1321447600020_817.doc x @ 20943 @ @ 1
GENERALLY
Pos : 15 /Anleitungen A5/Elektronik/Smartbox/1+2+3/Allgemeines SB 1,2,3 @ 0
\
mod_1305016715666_817.doc x @ 12089 @ @ 1
The electronic tank management system
SmartBox
®
1, 2 and 3
can be used for monitoring of
the liquids contained in unpressurized liquids tanks.
In addition to the registration of tank content, other functions can be implemented by system
enhancements, e. g. temperature measurement, data telecommunication, system fault or
connection to master control systems of the building.
The
SmartBox
®
2
has additional relay control functions, e. g. for activating external alarm
devices, solenoid valves, or the dry-run protection function of pumps.
The
SmartBox
®
3
has relay control functions and an audible alarm for minimum or maximum
level indication.
When the acoustic alarm sounds, it can be switched off by pressing the ‘Quit’
key.
Pos : 16 /Anleitungen A5/Elektronik/Smartbox/Bauk as tensy stem @ 1
\
mod_130 7439039869_817.doc x @ 14846 @ @ 1
Thanks to its modular design, the system can be equipped with additional modules, e. g. with
an analogue interface or a GSM module for telecommunication.
Pos : 17 /Anleitungen A5/Elektronik/Smartbox/M es sgerät nicht für Ab
rechnungsz weck e geeic ht @ 1
\
mod_1307438972899_817.doc x @ 14831 @ @ 1
The indicated measurements are not gauged for invoicing.
Pos : 18 /Anleitungen A5/Elektronik/Smartbox/1+2+3/SB1+2+3 2 -z eili ges Di s pla y @ 1
\
mod_1307439159324_817.doc x @ 14861 @ @ 1
SmartBox
®
1, 2 and 3
has a 2-line LCD display and a measuring input for connecting the
probe. The
SmartBox
®
2
also has additionally 2 programmable relays with make and break
switching output. The
SmartBox
®
3
has a programmable relay with make and break switching
output and an acoustic alarm for minimum or maximum level indication.
Pos : 19 /Anleitungen A5/Elektronik/Sonde/Tank ansc hlus s @ 0
\
mod_1305030006762_817.doc x @ 12180 @ @ 1
By default, the measuring probe can be installed with tank connecting threads G1, G1 1/2 or
G2.
Pos : 20 /Anleitungen A5/Elektronik/Smartbox/Betriebs medien @ 0
\
mod_1305017046920_817.doc x @ 12104 @ @ 1
OPERATING MEDIA
Fuel oil EL
acc. to DIN 51603-1
Standard probe
Hydraulic oil, Motor oil
fresh oil
Urea solution
e. g. AdBlue
®
acc. to DIN 70700
Liquid fertiliser
e. g. AHL
Water
Diesel fuel DK
acc. to DIN EN 590
on request
fuel oil in storage tanks
Glycol
Waste oil
Paraffin
Petrol flashpoint < 55
°
C
Only with ex-proof probe + protective
tube + ex-proof barrier
Other media on request!
Pos : 21 /Anleitungen A5/STAND ARDM ODULE/Allgem eine Sic herheits hinweis e/Sic herheitshinweis Öl @ 1 \
mod_1319009736459_817.doc x @ 20570 @ @ 1
WARNING
Leaking liquid fuels, such as fuel oil.
May cause you to slip and injure yourself and is also a hazard for groundwater.
Capture fuels during maintenance.
Observe the relevant laws and regulations.
Pos : 22 /--- Seitenumbr uc h A5--- @ 0
\
mod_1297265391854_0.doc x @ 3171 @ @ 1
Self Climat