Section 5: Operations
Operating All Models
Sacksafoam I Operator’s Manual
(Version C)
17
Dispensing Foam
1.
Mount the console in a convenient location inside the helicopter.
2.
Select the desired concentration and run time from the chart on top of the control box (or the chart
supplied loose with the console.)
3.
Set desired run times by pressing the small buttons on the digital dispense time switch. See the
table of control box functions for switch functions.
4.
Turn the control box on/off switch to ON.
5.
When the bucket is full and lifted clear of the water, momentarily turn ON the dispense switch to
dispense foam.
6.
The timer can be reset at any time and the inject cycle stopped by turning the on/off switch OFF,
then back ON.
Important Note
For the non-dash mount, the chart on the control box shows the minimum foam concentration
available at the indicated run time.
For the dash mount, use the supplied chart and place where operator wants or refer to manual.