Setting: Backflow Power 

 

 

                                                                        

 

 

This value shows the maximum power that can be pushed back into the local grid. Export values 
must be checked with the local municipalities and must be followed. Note that only surplus power is 
exported i.e. if solar generation is more than consumption and if surplus power exceeds max export 
value, the generation will be throttled to the set value. 

 

NB: For zero export plants, it is important to note that in case of a large sudden drop in load there 
will be a momentary export of power if there is no buffer. So, for plants where prepaid meters may 
experience  nuisance  trips  because  of  this  scenario,  set  this  value  to  i.e.  -  1000W  etc.  for  the 
inverters  to  start  throttling sooner  before  the  actual  zero  mark.  The  plant  size  must  be  used  to 
decide the buffer size. 

 

 

Setting: PLED 

 

 

 

This switch enables the EPM to work. It comes on by default and it is good to confirm that it is on 
because if off the EPM cannot function. 

 

 
 
 
 
 
 
 
 
 

Содержание EPM Plus 5G

Страница 1: ...Application Note Solis and EPM Quick Setup Guide...

Страница 2: ...wires between the inverter and EPM are properly connected asin the manual refer to system wiring diagram The EPM should always be connected to the first inverter on the RS485 bus if multiple units ar...

Страница 3: ...d Inverter communicates with Modbus protocol via RS485 2 wire UTP FTP Twisted pair cableshould always be used Important Settings for Inverter and EPM For the EPM to work the settings and parameters to...

Страница 4: ...rity onthe individual phases The image below shows the EPM landing page Advanced Settings Access the menu by pressing the Enter key and navigate to Advanced settings using the down arrow Press Enter o...

Страница 5: ...the set value NB For zero export plants it is important to note that in case of a large sudden drop in load there will be a momentary export of power if there is no buffer So for plants where prepaid...

Страница 6: ...atio is obtained by dividing the Primary Current Secondary Current e g a 200 5 CT will be 0040 1 Setting FailSafe Must be set to run This is a safety feature that stops inverter production should the...

Страница 7: ...mended 5A Checking your CT polarity The physical check is to make sure that P1 always faces the grid and P2 always faces the load If in doubt about the direction of the CT please follow these steps to...

Страница 8: ...er for details on how to connect the plant to the internet for remote monitoring andcreating an account for cloud monitoring NB Remote monitoring data is not real time Data points are logged after eve...

Отзывы: