Segen Solar EPM Plus 5G Скачать руководство пользователя страница 2

AN_EPM_SOL_Ver0.

 

Product Description 

 

 

Front View EPM Plus 5G 

 

 

 

Front View EPM Plus 5G 

 

 

The Solis EPM 5G is a device that allows you to adjust export values to satisfy local network 
regulatory requirements. 

 

 

General Notes 

 

 

Do not place 

communication cables with DC and AC cables in the same conduits or 

trunking as this may influence the normal communications.

 

 

Ensure that the communication 

wires between the inverter and EPM are properly 

connected as 

in the manual. (refer to system wiring diagram) 

 

The EPM should always be connected to the first inverter on the RS485 bus if multiple 
units are installed and the other inverters must be daisy chained. 

 

The  secondary  current  for  the  CT  should  be  5A  and  recommended  class  0.5CT  for 
higher accuracy on the measured values. 

 

The load must be switched off before disconnecting CT as this will open circuit the 
secondary of the CT and may cause damage to CT, EPM or injury. 

 

Date & Time setting 

must be the same on the EPM and the Inverters.

 

Содержание EPM Plus 5G

Страница 1: ...Application Note Solis and EPM Quick Setup Guide...

Страница 2: ...wires between the inverter and EPM are properly connected asin the manual refer to system wiring diagram The EPM should always be connected to the first inverter on the RS485 bus if multiple units ar...

Страница 3: ...d Inverter communicates with Modbus protocol via RS485 2 wire UTP FTP Twisted pair cableshould always be used Important Settings for Inverter and EPM For the EPM to work the settings and parameters to...

Страница 4: ...rity onthe individual phases The image below shows the EPM landing page Advanced Settings Access the menu by pressing the Enter key and navigate to Advanced settings using the down arrow Press Enter o...

Страница 5: ...the set value NB For zero export plants it is important to note that in case of a large sudden drop in load there will be a momentary export of power if there is no buffer So for plants where prepaid...

Страница 6: ...atio is obtained by dividing the Primary Current Secondary Current e g a 200 5 CT will be 0040 1 Setting FailSafe Must be set to run This is a safety feature that stops inverter production should the...

Страница 7: ...mended 5A Checking your CT polarity The physical check is to make sure that P1 always faces the grid and P2 always faces the load If in doubt about the direction of the CT please follow these steps to...

Страница 8: ...er for details on how to connect the plant to the internet for remote monitoring andcreating an account for cloud monitoring NB Remote monitoring data is not real time Data points are logged after eve...