Segen Solar EPM Plus 5G Скачать руководство пользователя страница 3

AN_EPM_SOL_Ver0.

 

System Connection Wiring Diagram 

 

 

 

The wiring diagram is also found in the user manual and EPM quick installation 

guide. 

 

NB: 

This application note must be used in conjunction with the user manual for any further 

reference. 

 

Communication 

 

The EPM and Inverter communicates with Modbus protocol via RS485 2 wire. UTP/FTP Twisted 
pair cable should always be used. 

 

 

Important Settings for Inverter and EPM 

 

For the EPM to work, the settings and parameters to be adjusted are done separately on the 
Inverter and the EPM 5G device. 

 

 

Inverter Settings 

 

 

Ensure correct date and time setting. 

 

Check set address and ensure Modbus Address is set to 01 (default address is 01). 

 

Under Advanced Settings, External EPM 5G must be enabled. 

 

 
 
 
 
 
 

Содержание EPM Plus 5G

Страница 1: ...Application Note Solis and EPM Quick Setup Guide...

Страница 2: ...wires between the inverter and EPM are properly connected asin the manual refer to system wiring diagram The EPM should always be connected to the first inverter on the RS485 bus if multiple units ar...

Страница 3: ...d Inverter communicates with Modbus protocol via RS485 2 wire UTP FTP Twisted pair cableshould always be used Important Settings for Inverter and EPM For the EPM to work the settings and parameters to...

Страница 4: ...rity onthe individual phases The image below shows the EPM landing page Advanced Settings Access the menu by pressing the Enter key and navigate to Advanced settings using the down arrow Press Enter o...

Страница 5: ...the set value NB For zero export plants it is important to note that in case of a large sudden drop in load there will be a momentary export of power if there is no buffer So for plants where prepaid...

Страница 6: ...atio is obtained by dividing the Primary Current Secondary Current e g a 200 5 CT will be 0040 1 Setting FailSafe Must be set to run This is a safety feature that stops inverter production should the...

Страница 7: ...mended 5A Checking your CT polarity The physical check is to make sure that P1 always faces the grid and P2 always faces the load If in doubt about the direction of the CT please follow these steps to...

Страница 8: ...er for details on how to connect the plant to the internet for remote monitoring andcreating an account for cloud monitoring NB Remote monitoring data is not real time Data points are logged after eve...

Отзывы: