background image

5

INSTALLATION INSTRUCTIONS

1)  First.  Remove all access panels from the game.  Locate the original game Logic PCB’s & Power

Supply and remove from the Cabinet by first disconnecting all harnesses from the boards.  (You need
only to splice in the Main Power (110v AC) into the 3-Pin Connector (GRN/WHT/BLK).)

2)  Remove all existing game harnesses (we suggest using New Jamma Harnesses (

NOT contained in the

kit

) to ensure reliability).

3)   Locate the most convenient and open area of the cabinet to mount the World Series 2001  Naomi

System Assembly.  Make sure this area is free and clear of all cable harnesses and grounds, cable
clamps, etc.

Vacuum out or clean bottom of cabinet of dirt & miscellaneous parts (e.g.
screws, loose coins / tokens, etc.).

Remove all exterior decals and repair any cabinet damage.  Repaint
cabinet if necessary.  Remove the Monitor Plexi or if your game plexi has
Silk-screened artwork, you will need to strip it off.

4)   Connect the JAMMA Harnesses to the JVS-JAMMA Interface Boards.  Separate the wires from each

other (i.e. Control Panel, Video, Speaker, Power Supply).  Run the various harnesses to the part of the
cabinet they go to ensuring they are dressed properly & secured to the cabinet.  Locate the Volume/
Speaker/Coin Meter Cable and connect to your existing

 Switch Bracket

 or use the new one included

with the kit.  

Note:

 

If you are using a VGA Compatible Monitor you can run your VGA Cable directly

to the monitor or connect it to your JVS JAMMA Interface for RGB Conversion to your JAMMA
Cables.

5)   Remove  Marquee from cabinet and cut to fit the new World Series 2001  Marquee in place.

 

REPLACE

 old Joysticks & Buttons with the 

NEW

 ones supplied in Kit.

6)   First remove all Joystick and Button assemblies from the Control Panel.  Remove Lexan and Control

Panel Overlay.  Proceed to clean surface of the Control Panel by removing all adhesive and dirt.  Fill
in or plug up existing button holes to set up a blank work area for your new controls.

7)   Install the new Control Panel Overlay by carefully peeling off the paper backing and laying down on

the panel.  Smooth it out, starting in the center and working your way to the edges (removing all of
the trapped air pockets).  If necessary, cut the edges of the overlay excess and fold under panel.

8)   Cut out the button and Joystick Holes.  Install Joystick and buttons from kit into the Control Panel

and tighten down.  Connect all game harness wires to switches and buttons.

Содержание Universal Kit

Страница 1: ...RINTING JUNE 01 MANUAL NO 999 1292 SEGA ENTERPRISES INC USA Universal Kit Kit Installation Instructions Service Manual Switchable FROM High Resolution 31K TO Standard Low Resolution 15 75K 1 2 PLAYER...

Страница 2: ...vent a warranted part described above fails shall be at its option to replace or repair the defective part during the warranty period For Warranty claims contact your Sega Distributor Should the Selle...

Страница 3: ...999 1296 999 1297 NOA 20010 01 Desc NAOMI POWER SUPPLY AUDIO POWER AMP 2 CH AUDIO XFORMER 120V JAMMA I O BD NAOMI USB CABLE VGA VIDEO CABLE ASSY CASE PC1 DIMM BD CABLE SCSI TYPE 2 500MM SERVICE SWT B...

Страница 4: ...2 ASSY CTRL PNL 2A4B2S MB2K2 ENG NOA 20010 01 D 1 2...

Страница 5: ...PINK 102 610 6723 4B01 ASSY ANALOG JOY 4B GREEN 103 610 0409 ASSY BAT MECHA 104 999 1290 PUSHBUTTON RND YELLOW W MICRO 2 PER 105 999 1086 PUSHBUTTON RND GREEN W MICRO 2 PER 106 999 1289 PUSHBUTTON RN...

Страница 6: ...Connector at Game BD Yellow 5vdc Brown 3 3vdc White Gnd Step 2 You MUST USE THE COIN METER SUPPLIED WITH YOUR KIT to assure proper Coin acceptance A minimum 18 Gauge wire should be used from the Coin...

Страница 7: ...the cabinet they go to ensuring they are dressed properly secured to the cabinet Locate the Volume Speaker Coin Meter Cable and connect to your existing Switch Bracket or use the new one included with...

Страница 8: ...cessary to 5 15v DCand 3 3vDC Measure the 12 to ensure the wires and voltages are in the correct position Turn power off Plug in the JAMMA Harness once again to the I O Boards The Attract Mode should...

Страница 9: ...Test Service Volume JAMMA Pin R JAMMA Pin 15 JAMMA Pin 1 Yellow Wire from Extra Harness 5v JAMMA Pin 8 _ Pin 1 Pin 5 Pin 4 To CN1 of Amplifier Board YEL RED WHT RED GRN RED From CN2 of Amplifier Board...

Страница 10: ...1 Coin Meter 2 Not Used Not Used Not Used Not Used Not Used Not Used Video Red Video Blue Video Ground Video Green Video Sync Service Test Not Used Coin 1 Coin 2 1P Start 2P Start 1P UP 2P UP 2P Down...

Страница 11: ...Connector Description etc PSW2 PSW1 CN3 CN2 CN1 DIPSW1 Power Connectors VGA Level Video Out Preamp Level Audio Out Test Switch Service Switch 1 1 2 2 3 3 4 Setting for High Resolution 31KHZ 1 4 off Se...

Страница 12: ...acceptance time BAT MECHA Swing START Start game Time out for throwing batting The analog input on the I O board uses the following channels CH0 1P ANALOG LEVER VOLUME VERTICAL UP FFH DOWN 00H CH1 1P...

Страница 13: ...onnector AMP 3P white Remove the wiring connector AMP 3P white located near the volume Remove the tamperproof screw clamping the bat center axis on the front side of the control panel Tightening loose...

Страница 14: ...ding strategy you use depends on the level you selected LEGEND HARD Hard Both catching and throwing the ball are operated by the player The speed of the pitched ball i e pace is the maximum VETERAN ME...

Страница 15: ...ngs If this is OFF the baseball game ends when the bottom of the ninth inning ends even if the score is even i e the game is drawn CALLED GAME Can be set in the 5 to 10 range When the difference in sc...

Страница 16: ...auge Batting Cursor Strike Zone Batter s Batting Team If your expectation turns out right the batting cursor is highlighted and the probability of hit increases Pitcher s Fielding Team Pressing the bu...

Страница 17: ...h by fine play If you selected ROOKIE EASY for the level at the start of the game the above operations are unnecessary Throw Shift Select the desired base using the lever Pressing the A Button causes...

Страница 18: ...right hander Original ability of pitcher Batting Cursor If you successfully expect the actual pitch type the shape of the batting cursor changes If your entered expectation turns right the cursor tur...

Страница 19: ...EA SAFECO Field 12 Tampa Bay Devil Rays TB Tropicana Field 13 Texas Rangers TEX The Ballpark in Arlington 14 Toronto Blue Jays TOR SkyDome National League 1 Arizona Diamondbacks ARI BankOne Ballpark 2...

Страница 20: ...n the GAME TEST MODE to display the GAME TEST MENU peculiar to this game See the next page onward 4 Upon finishing the test bring the arrow to EXIT and press the TEST Button to return to the Game mode...

Страница 21: ...the currently selected item You are brought to the screen for that item and can change or adjust the settings With EXIT selected pressing the TEST Button returns you to the System Test Menu Screen All...

Страница 22: ...control values respectively Check whether each of the values changes and the cursor moves smoothly according to the lever or batting switch operations you make Lever and batting switch settings LEVER...

Страница 23: ...e arrow to the item to which you want to make change Pressing the TEST Button changes the indication located at the right of the currently selected item Change it to the desired one Press the SERVICE...

Страница 24: ...2 INNINGS setting 1 2 3 4 5 6 7 8 9 10 11 12 3 INNINGS setting 1 2 3 4 5 6 7 8 9 10 11 12 ALL INNINGS setting No additional credit is required even if you play the extra part of the baseball game to...

Страница 25: ...s exited This screen lets you set the sensitivity of the input devices If you are unsatisfied with the operability or have adjusted or replaced the volume control of an input device make the settings...

Страница 26: ...ly and then leave it unloaded Move the SERVICE Button to align the arrow with EXIT WITH SAVE and press the TEST Button Save the settings and return to the Game Test Menu Screen If you press the TEST B...

Страница 27: ...you to the Game Test Menu Screen BOOKKEEPING NUMBER OF GAMES 0 TOTAL PLAY TIME 0D 00H 00M 00S AVERAGE PLAY TIME 00M 00S LONGEST PLAY TIME 00M 00S SHORTEST PLAY TIME 00M 00S PRESS TEST BUTTON TO EXIT B...

Страница 28: ...tings except the data When clearing use the SERVICE Button to bring the arrow to YES CLEAR and press the TEST Button When the data has been cleared COMPLETED will be displayed Press the TEST Button to...

Страница 29: ...ame Board refer to the CVT Manual and Instruction Manual PART NO DESCRIPTION 840 0051D 01 ASSY CASE NAO PCI DIMM BD USA 840 0051D 02 ASSY CASE NAO PCI DIMM BD EXP 840 0051D 03 ASSY CASE NAO PCI DIMM B...

Страница 30: ...28 PART NO DESCRIPTION 840 0001F ASSY CASE NAO DIMM BD COM KEY CHIP 840 0067B DIMM BD NAO MB2K2 442 00067B STICKER 840 0067B Attached place 1 2 1 2 1 2...

Страница 31: ...aminated disk use clean cloth that has been soaked in water and squeezed Then remove moisture with dry cloth When holding a disk be careful not to contaminate it with your fingerprints How to Hold a D...

Страница 32: ...30 PART NO DESCRIPTION 610 0624 0010 GD SOFT KIT MB2K2 ENG GDS 0010 NAOMI GDROM MB2K2 KEY CHIP 420 6621 0010E SERVICE MANUAL MB2K2 ENG 253 5507 DISK CASE WITH IC HOLDER 1 2 3 4 1 2 3 4 1 2 3 4...

Страница 33: ...91 3 2 1 30 10 50 50 120 Vac Input Extra 5k pot SPEAKER OUTPUTS To PIN 8 of Jamma To Extra Yellow Wire COIN COUNTER JAMMA CONNECTIONS USED ARE VIDEO OUT SWITCH INPUTS SWITCH GROUND RETURNS COIN COUNTE...

Страница 34: ......

Страница 35: ...VISIT OUR WEBSITE...

Страница 36: ......

Отзывы: