36
9
Dismantling / Reassembly
Ausgabe
issue
D / 30.08.2012
Dokument
document
OM.PJT.02e
Blatt
sheet
2 (5)
9.2.2 Rotating unit (RTE) - prepare individual parts for reassembly
9.2.2.1 Rotor (600)
9.2.2.2 Coupling rod (400)
Bend
(A)
the coupling rod
(400)
. Knock
guide bushing
(403)
out with tool
(W5)
.
Remove coupling rod
(400)
.
Remove any damage.
Clean rotor
(600)
.
Tool (
W4
/assembly mandrel)
Press in guide bushings
(403)
(depth = 2/3).
–
Use tool
(W4)
.
Clean the coupling rod
(400)
.
Examine bore head for wear.
–
If wearing is detected on the bore
head, replace the coupling rod
(400)
.
Содержание BCSB 025-12
Страница 2: ......
Страница 6: ......
Страница 12: ...6 ...
Страница 14: ...8 ...
Страница 20: ...14 ...
Страница 32: ...26 ...
Страница 40: ...34 ...
Страница 46: ...40 ...
Страница 50: ...44 ...
Страница 51: ...Ausgabe issue B 29 03 2011 Dokument document OM SZG 02e Blatt sheet 1 1 10 Spare parts 10 1 Spare parts list ...
Страница 52: ...46 ...
Страница 56: ...50 ...
Страница 58: ...52 ...
Страница 60: ...54 ...
Страница 61: ...55 ...