BREEZAIR EXVQ EVAPORATIVE COOLER INSTALLATION MANUAL
|
3
STEP 22
FINAL CHECK
Test & complete the commissioning
checklist at the end of this document.
STEP 6
MOUNT COOLER
Mount cooler to the dropper.
Check pan (reservoir) is level.
STEP 16
COMMISSION THE COOLER
Test the cooler with the MagIQtouch
Controller. Check diagnostics of cooler
electronics. Test the motor.
STEP 23
CLEAN UP
Clean up the site!
STEP 17
WATER LEVEL & DRAIN
Set the water level.
Test the drain valve.
STEP 24
CUSTOMER HANDOVER
Show customer how to operate the
cooler. Give them both the MagIQtouch
Controller and cooler owner’s manual.
Explain maintenance requirements.
page 15
page 5
page 12
page 15
page 13
page 15
ON
ILL3388-A
STEP 4
LEVEL ROOF JACK
Position, level, secure and seal the roof
jack.
STEP 10
REGULATIONS
Read & adhere to the local & national
electrical and plumbing regulations.
STEP 5
CONVEY COOLER
Convey the cooler to the roof.
Note
! Always use 2 people when
handling manually.
STEP 11
INLET SOLENOID
Fit the solenoid.
Connect the cable.
Connect the
water supply.
Install the drain pipe.
STEP 12
DRAIN VALVE
Fit the drain valve.
Connect the discharge system.
Connect the cable to the cooler
electronics.
page 5
page 7
page 5
page 9
ILL922-B
A
C
D
E
B
page 8
STEP 18
SETTING THE CONTROL METHOD
Set water management method
Set salinity control method.
page 14
QUICK GUIDE