![SEELEY INTERNATIONAL AIRA DU SD Series Скачать руководство пользователя страница 54](http://html.mh-extra.com/html/seeley-international/aira-du-sd-series/aira-du-sd-series_installation-and-operation-manual_1233142054.webp)
52
|
APPENDIX F: MAINTENANCE
Installation
Access to unit
Access to unit is clear of obstructions. Roof anchor
system is compliant and certified if required.
Weatherproof casing
Check that the case is free of damage. Check that
all access panels are secure. Check the internal of
the cases for signs of water build up. Remove any
foreign objects.
Duct Condition
Check duct connection to unit.
Internal Condition
Check for signs of water carry over. Check that the
internal reservoir is not leaking.
General Installation
Check the condition of all fixings securing the unit.
If a roof stand is installed check condition of the
stand. Confirm that the unit is level.
Maintenance records
Check that previous maintenance records are in a
safe location and any required maintenance items
have been actioned
Operation
Start up and run
sequence
Check that unit operates as expected with no
visual, sound or smell abnormalities.
Control Operations
Check that thermostat and wall switch/BMS
controls operate as expected
Motor Amps High and
Low Speed
Check motor amps on high and low speeds to
ensure the motor is not over-amping.
Pad saturation
Check that pads are sufficiently saturated. Under
saturation will limit cooling. Over saturation will
lead to water carry over.
Safety Features
Allow the unit to run for 45 minutes to an hour
to ensure the units run as expected. To pass no
safety features may trip.
Checked By: ______________________________
Signature: ________________________________ Date:_________________
Содержание AIRA DU SD Series
Страница 1: ...INSTALLATION AND OPERATION DU SD SERIES HEATER OR MODELS Original English Instructions AMI115 A ...
Страница 2: ......
Страница 4: ...2 ...