19
www.seagullmodels.com
4) When you are sure that everything is
aligned correctly, mix up a generous amount of
Flash 30 Minute Epoxy. Apply a thin layer to the
mounting slot and to bottom of the vertical sta-
bilizer mounting area. Apply epoxy to the bot-
tom and top edges of the filler block and to the
lower hinge also. Set the stabilizer in place
and realign. Double check all of your measure-
ments once more before the epoxy cures. Hold
the stabilizer in place with T-pins or masking
tape and remove any excess epoxy using a
paper towel and rubbing alcohol. Allow the ep-
oxy to fully cure before proceeding.
AILERON PUSHROD HORN INSTALLATION
M3 lock nut.
M3 clevis.
90mm.
110mm.