background image

Before unpacking your EchoBoat prepare a 

boat stand to allow the EchoBoat to sit level 

and give you access to the underside of the 

hull. A 2x4 frame with pipe insulation foam that 

will protect the hull from scratches works well. 

Seafloor Systems also offers the EchoBoat 

EchoCart, a rugged metal frame with padded 

supports and wheels for easy transporting and 

launching.

Remove bubble wrapped Mast, Mast 

Supports, Battery Charge Box and other 

items packed around the EchoBoat and 

set aside.

Prepare a stand for the EchoBoat at the Bow 

side of the packing crate. With two people, 

one on either side of the EchoBoat, lift the 

EchoBoat out of the crate bow first and place 

on the stand.  Lift from installed handles.

Open the hull of the EchoBoat by loosening the black knobs around the perimeter of the 

hull lid. Then remove the remote control, hardware pack and any other optional items that 

are packed in the hull of the EchoBoat. Next reinstall the hull lid, it is not necessary to fully 

tighten the hull lid at this time.

Step 4

Assembling your EchoBoat
Step 1

Step 2

Step 3

v2 - 10/02/19 Page 4 of 15

Seafloor Systems, Inc. | [email protected] | +1 (530) 677 - 1019

Содержание EchoBoat ASV

Страница 1: ...Seafloor Systems Inc Info seafloorsystems com 1 530 677 1019 EchoBoat Seafloor TM TM Model ASV RCV Unmanned Survey Vessel...

Страница 2: ...he dynamic conditions of inland waterways If you are adding the optional AutoNav Auto Pilot Module The survey vehicle can be monitored while underway in both Auto and Manual modes The mission planner...

Страница 3: ...ore powering the boat If when powered up the receiver on the boat does not detect a controller signal the remote control unit may unexpectedly enter the fail safe mode This could be extremely dangerou...

Страница 4: ...nts damage to property or injury death associated with the use of any of its products or 3rd party products that may be included or used with Seafloor products Seafloor does not warranty third party p...

Страница 5: ...d set aside Prepare a stand for the EchoBoat at the Bow side of the packing crate With two people one on either side of the EchoBoat lift the EchoBoat out of the crate bow first and place on the stand...

Страница 6: ...he hull and the Mast Support feet With a end wrench and the provided Allen key driver install the mast with the included hardware The Mast is marked with an F for forward All hardware for the Mast and...

Страница 7: ...provided 3 16 allen key The EchoBoat is now fully assembled Before moving forward please review the battery charging instruction manual and charge the 14 8V 4S and 22 2V 6S batteries Please also revie...

Страница 8: ...e EchoBoat To install remove the four thumbscrews on the battery hold down straps The four Venom 14 8V 4S batteries should be oriented with two battery cords towards the port side and two cords toward...

Страница 9: ...atteries are unable to be installed by simply swinging theAutoNav to the side it may be necessary to remove theAutoNav completely A Remove the four thumbscrews on the four corners on theAutoNav B Remo...

Страница 10: ...oBoat This will turn AutoNav on if the switch is in the on position Wait approximately 15 seconds for speed controllers to pair They will go through a series of tones and LED flashes Using Arming swit...

Страница 11: ...t is thruster motor will blow air aft of the boat This indicates forward thrust of the boat D Reverse Thrust Test While holding a piece of paper approximately 6 inches aft of each thruster motor slowl...

Страница 12: ...damage to the batteries 5 1 2 3 4 Launching and Retrieving the EchoBoat B Before launching the EchoBoat ensure the drain plug is tight and hull lid is secure C Power up the EchoBoat and test thruster...

Страница 13: ...k the access hatch gasket for cuts cracks or deformation This gasket seals the instrumentation area from water intrusion and should be checked frequently F Lube gaskets where needed F Carefully inspec...

Страница 14: ...removing those four screws with 2 mm allen key If you are replacing the thruster skip to step 10 Remove the four 2 Phillips screws along the outer edge of the thruster Pull the base and propeller out...

Страница 15: ...r disassembly is required Make sure to clean inside of the nozzle and tail cone Step 8 Step 7 Most importantly clean the area between the motor assembly and the thruster base as well as the gap as lon...

Страница 16: ...llen key or punch to press the grey gasket out of the compression fitting The thruster wire will now pull through the EchoBoat hull Install new thruster by putting new wire through hull then slide gre...

Отзывы: