13
5. INSTALLATION OF THE OPERATOR
5.1.
Insert manually the operator
into the
carrying box (Fig. 20) also insert the splined shaft of the operator
into the splined bush of the box and fix the operator with the special screws as in Fig. 21.
5.2.
Carry out the electrical connections to the control unit as described in the instructions supplied with
SEA control unit.
After ending all the operations in the installation of the above mentioned carrying box, of the gate and the
operator, try to do some moves slowly by hand verifying that there are not irregular frictions and that the
movement is uniform for the whole range.
Notice:
To do this last operation, release the operator as described in the next paragraph.
Fig. 20
Fig. 21
N.B.
: It is advisable to weld the crank with the
crank shaft also after having installed the Compact
or Super Compact, to use the whole available run
and the point of beginning of the desired
slowdown (version with hydraulic slowdown).
Before welding, make sure that one of the level of
the crank shaft corresponds with a side of the
crank (see fig.21 and 22) to guarantee the
maximum angle with the mechanical stops Kit
Fig. 22
1
2
International registered trademark n. 2.777.971
6. MOTOR RELEASE SYSTEM
6.1. To release act as follows:
-Turn the release screw with the screwdirver about 180° ca. in anti- clockwise direction (Fig. 23).
6.2. To stop again act as follows:
-Turn the release screw with the screwdriver into clockwise direction until it stops.
Fig. 23
N.B.
: If the operator is not
installed immediately but in
a
second
time,
it
is
recommended to weld the
crank shaft and the crank
during the installation of the
Compact/Super Compact
Lock
Release
Содержание COMPACT 120V
Страница 19: ......