10

3.2.

Inside the excavated pit you have to plan:

-

rain water drainage

;

-

a water waste pipe in flexible plastic of about 1,5 inches of diameter to put inside the provided hole of the 
box before it is concreted (Fig. 10). 

It must be brought until the drain of the sewer line

;

-

a sheath for the passage of electrical cables of about 0,8 inches of diameter which must be brought to the 
proximity of the electric connection box (Fig. 10).

Fig. 10

Sheath for electric
cables passage

Flexible pipe
for water draining

Electric
connection box

International registered trademark n. 2.777.971

3.3.

Before concreting the carrying box, use a level to make it perfectly horizontal to the ground (Fig. 11) and 
perpendicular to the axis of the gate  (Fig. 12).
The axis of the upper hinge of the gate must correspond exactly to the axis of the carrying box shaft.

Fig. 11

Fig. 12

Содержание COMPACT 120V

Страница 1: ...ORMATION web site www sea usa com e mail sales sea usa com REV 05 04 2018 67410796 International registered trademark n 2 777 971 SEA USA Inc 10850 N W 21st unit 160 DORAL MIAMI Florida FL 33172 Phone...

Страница 2: ...danger 8 Do not allow children to play or stay within the path of the moving gate 9 Keep remote control or any other control devices out of the reach of children in order to avoid possible involuntary...

Страница 3: ...ng intended installation of the gate operator shall be supplied as part of the installation instructions or as a separate document The following instructions or the equivalent shall be supplied where...

Страница 4: ...es on not assessable further risks SEA USA Inc in its relentless aim to improve the products is allowed to make whatsoever adjustment without giving notice This doesn t oblige SEA to up grade the past...

Страница 5: ...to move toward a rigid objact closer than 16 inches 406mm are not required to be provided with a means of entrapment protection B1 and B2 means of entrapment protection MUST be MONITORED HORIZONTAL S...

Страница 6: ...h are unnecessary can be eliminated the lower and that in the middle if exists GATE WARNINGS AND PRECAUTIONS Not for pedestrian opening Fig 1 Fig 2 Fig 3 PRECAUTIONS This automation has been created f...

Страница 7: ...h a separate electrical locking device to ensure keeping in closing On the operators with hydraulic slow down it is present only during the last 15 of rotation The system comes with a release which al...

Страница 8: ...tion 230V 50 60 Hz 220 W 1 35 A 120V 50 60 Hz 220 W 2 45 A 1530rpm 60 50 bar 4 F 131 F 3336 lbf 60 uF 10 uF 33 Lbs 3R Type 2600 Lbs On control unit or on operator 230V 50 60 Hz 310 W 1 5 A COMPACT 160...

Страница 9: ...7 3 10 EXIT LOOP CENTER LOOP SAFETY LOOP IN OUT Fig 8 MECHANICAL INSTALLATION International registered trademark n 2 777 971 3 CARRYING BOX INSTALLATION 3 1 The hole which contains the carrying box mu...

Страница 10: ...ut 0 8 inches of diameter which must be brought to the proximity of the electric connection box Fig 10 Fig 10 Sheath for electric cables passage Flexible pipe for water draining Electric connection bo...

Страница 11: ...that the concrete has hardened into the foundation hole 4 1 Place the leaf of the gate on the leaf device making reference to the rotation axe of the leaf hinge Fig 14 Fig 14 leaf device leaf rotation...

Страница 12: ...the axis Fig 17 and 18 but make sure the shaft corresponds to the hinge rotation axis remembering that the minimum distance from the pillar is 2 16 inches Fig 19 Fig 16 International registered tradem...

Страница 13: ...is advisable to weld the crank with the crank shaft also after having installed the Compact or Super Compact to use the whole available run and the point of beginning of the desired slowdown version w...

Страница 14: ...er the leaf device using the 5 furnished screws Fig 25 Carry out the electrical connections to the control unit as described in the instructions supplied with SEAcontrol unit Fig 24 A Release Fig 25 A...

Страница 15: ...ll not change the speed of the leaf Notice The maximum regulation is of 33 pound The motor run time is the last adjustment to make It should be set 2 to 4 seconds higher than it takes to the gate to r...

Страница 16: ...he key against the external of the release making come out the handle of the lock until it reaches the stop Fig 38 Move the leaf and make return the handle of the release in its original position and...

Страница 17: ...hout giving notice This doesn t oblige to up grade the past SEA USA Inc production can not be deemed responsible for SEA USA Inc any damage or accident caused by product breaking being damages or acci...

Страница 18: ...ust contact SEAfor instructions WARRANTY for the original buyer only Hydraulic and oil bath motors 36 months warranty from the date of invoice on manufacturing assembling and workmanship defects Elect...

Страница 19: ......

Страница 20: ...850 N W 21st unit 160 DORAL MIAMI Florida FL 33172 USA Phone 1 305 594 1151 Fax 1 305 594 7325 Toll Free 800 689 4716 web site www sea usa com e mail sales sea usa com International registered tradema...

Отзывы: