Installation
9497B-21 C/Ku-Band TVRO
4-16
4.
Use wedges to lift the upper panels off
of the lower panels about ½ inch.
5.
Install a good bead of caulking
between the bottom of the upper
panels and the top of the lower panels
ghten all of the bolts in that seam
(smaller dual beads of caulking can be
applied from outside and inside if you
prefer). , remove the wedges and
radome lifting brackets, then firmly
tighten all the bolts.
6.
Remove the tape from the upper and
lower panels. All tape should now be
removed from the radome.
7.
The ADE Assembly is now
complete, ready for web straps to
be attached for lifting the ADE
onto the ship.
4.5.8.
Refer to the Base Frame Assembly drawing for your system and the procedure below.
Prepare the 144” Radome ADE for Lift
Refer to lit kit
WARNING:
Hoisting with other than a webbed four-part sling may result in catastrophic crushing
of the radome. Refer to the specifications and drawings for the fully assembled weight of your
model Antenna/Radome and assure that equipment used to lift/hoist this system is rated
accordingly.
CAUTION:
The antenna/radome assembly is very light for its size and is subject to large swaying
motions if hoisted under windy conditions. Always ensure that tag lines, attached to the radome
base frame, are attended while the antenna assembly is being hoisted to its assigned location
aboard ship.
1.
Enter the ADE and stow the antenna
pedestal using the Stow Kit (provided)
and the instruction in the Maintenance
section of the antenna manual.
2.
Attach eye-bolts or shackles (properly
rated for the weight to be lifted) to four
equidistant lifting point holes around
the perimeter of the Base Frame.
3.
Attach properly rated web lifting straps
to the eye-bolts, or shackles.
4.
Attach Appropriate length of rope tag
lines to the Base Frame.
5.
The ADE is now ready to hoist onto the
ship.
Содержание 9497B-21
Страница 3: ......
Страница 4: ...iv Revision History REV ECO Date Description By A N A August 17 2010 Initial Production Release MDN ...
Страница 40: ...Setup 9497B 21 C Ku Band TVRO 5 4 This Page Intentionally Left Blank ...
Страница 70: ...Maintenance and Troubleshooting 9497B 21 C Ku Band TVRO 7 28 This Page Intentionally Left Blank ...
Страница 76: ...9497B 21 Technical Specifications 9497B 21 C Ku Band TVRO 8 6 This Page Intentionally Left Blank ...
Страница 78: ...Model 9497B 21 Drawings 9497B 21 C Ku Band TVRO 9 2 This Page Intentionally Left Blank ...
Страница 80: ......
Страница 83: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 97: ......
Страница 98: ......
Страница 102: ......